ERC HVAC Upgrades At Pinners Point Administration Office RFP
Jun 19, 2026
Closes
Sep 30, 2026
Provide HVAC upgrades. Work includes cutting and patching the existing roof for the installation of the new rooftop air handling units. Insulate and cover new exterior chilled water piping with aluminum protective jacket and heat trace. Install new chiller circuit and wiring, three new 120 volt circuits for chilled water piping, pumps and storage tank heaters and controls; install an new DDC control system for the building heating and cooling systems.