Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Edgewater West Community Development District
Provide professional engineering services will be required on a continuing basis for the districts capital improvement plan, including stormwater management system, landscaping improvements, utilities, roadway improvements, and other public improvements.
Posted Date
May 15, 2026
Due Date
May 29, 2026
Release: May 15, 2026
Edgewater West Community Development District
Close: May 29, 2026
Provide professional engineering services will be required on a continuing basis for the districts capital improvement plan, including stormwater management system, landscaping improvements, utilities, roadway improvements, and other public improvements.
Edgewater West Community Development District
The project consists of approximately 1,600 LF of four-lane divided roadway with 11-foot travel lanes, seven-foot parallel parking spaces, seven-foot bike lanes, right and left-turn lanes, with a five-foot sidewalk on one side, and a ten-foot trail on the other. Additionally, the project will include potable water, reuse, and wastewater utilities along with a stormwater management system.
Posted Date
Jul 3, 2025
Due Date
Aug 19, 2025
Release: Jul 3, 2025
Edgewater West Community Development District
Close: Aug 19, 2025
The project consists of approximately 1,600 LF of four-lane divided roadway with 11-foot travel lanes, seven-foot parallel parking spaces, seven-foot bike lanes, right and left-turn lanes, with a five-foot sidewalk on one side, and a ten-foot trail on the other. Additionally, the project will include potable water, reuse, and wastewater utilities along with a stormwater management system.
Edgewater West Community Development District
The project consists of approximately 5,600 LF of two-lane undivided roadway with 11-foot travel lanes, seven-foot parallel parking spaces, five-foot and six-foot sidewalks, and a ten-foot trail for a portion of the roadway. Additionally, the project will include potable water, reuse, and wastewater utilities along with a stormwater management system. The potable water main will consist of approximately 6,970 LF of 8-inch PVC water main constructed. The potable water main includes the associated valves, hydrants, and fittings, and will connect to an 8-inch stub-out
Posted Date
Jul 3, 2025
Due Date
Aug 19, 2025
Release: Jul 3, 2025
Edgewater West Community Development District
Close: Aug 19, 2025
The project consists of approximately 5,600 LF of two-lane undivided roadway with 11-foot travel lanes, seven-foot parallel parking spaces, five-foot and six-foot sidewalks, and a ten-foot trail for a portion of the roadway. Additionally, the project will include potable water, reuse, and wastewater utilities along with a stormwater management system. The potable water main will consist of approximately 6,970 LF of 8-inch PVC water main constructed. The potable water main includes the associated valves, hydrants, and fittings, and will connect to an 8-inch stub-out
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge