Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Eastern Region's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Track vendor wins and renewal opportunities
Eastern Region
BIA, CHOCTAW AGENCY RENOVATION
Effective Date
Aug 7, 2025
Expires
Effective: Aug 7, 2025
Eastern Region
Expires:
BIA, CHOCTAW AGENCY RENOVATION
AvailableEastern Region
EMERGENCY HVAC REPAIRS FOR CHEROKEE AGENCY
Effective Date
Jul 24, 2025
Expires
Effective: Jul 24, 2025
Eastern Region
Expires:
EMERGENCY HVAC REPAIRS FOR CHEROKEE AGENCY
Eastern Region
UTVS FOR CHOCTAW AGENCY
Effective Date
Jun 23, 2025
Expires
Effective: Jun 23, 2025
Eastern Region
Expires:
UTVS FOR CHOCTAW AGENCY
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Active opportunities open for bidding
Eastern Region
Fire building renovation.
Posted Date
Jul 10, 2025
Due Date
Jul 31, 2025
Release: Jul 10, 2025
Eastern Region
Close: Jul 31, 2025
Fire building renovation.
Eastern Region
Provide all equipment, labor, and materials necessary to install a fixed safety ladder along with a fall arrest system. The ladder shall be installed on the upstream side of the intake tower and likely requires boat-based installation. The contractor shall verify all dimensions and make necessary adjustments for the installation. Two harnesses with all required accessories compatible with the system shall also be provided
Posted Date
Jul 24, 2024
Due Date
Aug 9, 2024
Release: Jul 24, 2024
Eastern Region
Close: Aug 9, 2024
Provide all equipment, labor, and materials necessary to install a fixed safety ladder along with a fall arrest system. The ladder shall be installed on the upstream side of the intake tower and likely requires boat-based installation. The contractor shall verify all dimensions and make necessary adjustments for the installation. Two harnesses with all required accessories compatible with the system shall also be provided
Eastern Region
Provide all equipment, labor, and materials necessary to replace existing fifty-six (56) window; ensure that all new fifty-six (56) windows are vinyl, single pane, and double insulated that are all installed plumb, level, square and watertight; ensure that all interior and exterior finishes match existing finishes; replace with new material and matching color of existing finishes to any/all damage caused to interior or exterior during installation. See outside link.
Posted Date
Aug 26, 2024
Due Date
Sep 13, 2024
Release: Aug 26, 2024
Eastern Region
Close: Sep 13, 2024
Provide all equipment, labor, and materials necessary to replace existing fifty-six (56) window; ensure that all new fifty-six (56) windows are vinyl, single pane, and double insulated that are all installed plumb, level, square and watertight; ensure that all interior and exterior finishes match existing finishes; replace with new material and matching color of existing finishes to any/all damage caused to interior or exterior during installation. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.