Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Eagle County Regional Airport
This project consists of the procurement of a class 5, 6x6 aircraft rescue & fire fighting (ARFF) vehicle with a high reach turret and with agent capacities of 3,000-gallon water/f3 fire suppression system. The ARFF vehicle shall meet the guidelines established in advisory circular 150/5220-10 (current edition). 1 EA bullard thermal imaging camera; 3 EA seek firepro thermal imaging camera; 1 EA 16" supervac milwaukee battery- operated vent fan; 1 EA flat head axe; 1 EA fire axe; 1 ea crash axe; 1 EA probar hallagan; 1 EA pinch point crow bar; 1 EA gooseneck wrecking bar; 1 EA sledge hammer.
Posted Date
Jan 14, 2026
Due Date
Mar 12, 2026
Release: Jan 14, 2026
Eagle County Regional Airport
Close: Mar 12, 2026
This project consists of the procurement of a class 5, 6x6 aircraft rescue & fire fighting (ARFF) vehicle with a high reach turret and with agent capacities of 3,000-gallon water/f3 fire suppression system. The ARFF vehicle shall meet the guidelines established in advisory circular 150/5220-10 (current edition). 1 EA bullard thermal imaging camera; 3 EA seek firepro thermal imaging camera; 1 EA 16" supervac milwaukee battery- operated vent fan; 1 EA flat head axe; 1 EA fire axe; 1 ea crash axe; 1 EA probar hallagan; 1 EA pinch point crow bar; 1 EA gooseneck wrecking bar; 1 EA sledge hammer.
Eagle County Regional Airport
Project shall consist of the construction of a portion of the planned/proposed parallel taxiway b, which will be north of the current runway 7-25. This project will be for the first phase of construction and paving of new parallel taxiway B. This follows the two previous projects focused on taxiway b which were two embankment and drainage improvement projects. The first embankment project was completed in summer 2022 and the second embankment project was completed in summer 2024. With taxiway B being constructed, it is anticipated that future development will occur on the north side of the airport. This development will be for aeronautical purposes and could potentially bring a variety of different aircrafts. For this reason, new taxiway b will be designed to accommodate ADG III/TDG iv aircraft. Connector taxiway b4 will be relocated as a part of this project and a connection to the HAATS apron will be made as well. Also included in this project will be drainage improvements and storm sewer infrastructure on the north side of the airport. These stormwater drainage infrastructure improvements will include piping, inlets, manholes, and potentially outfall structures. Taxiway B will not include centerline lighting or taxiway edge lights but will have retroreflective taxiway edge markers installed as a part of this project.
Posted Date
Apr 23, 2025
Due Date
May 21, 2025
Release: Apr 23, 2025
Eagle County Regional Airport
Close: May 21, 2025
Project shall consist of the construction of a portion of the planned/proposed parallel taxiway b, which will be north of the current runway 7-25. This project will be for the first phase of construction and paving of new parallel taxiway B. This follows the two previous projects focused on taxiway b which were two embankment and drainage improvement projects. The first embankment project was completed in summer 2022 and the second embankment project was completed in summer 2024. With taxiway B being constructed, it is anticipated that future development will occur on the north side of the airport. This development will be for aeronautical purposes and could potentially bring a variety of different aircrafts. For this reason, new taxiway b will be designed to accommodate ADG III/TDG iv aircraft. Connector taxiway b4 will be relocated as a part of this project and a connection to the HAATS apron will be made as well. Also included in this project will be drainage improvements and storm sewer infrastructure on the north side of the airport. These stormwater drainage infrastructure improvements will include piping, inlets, manholes, and potentially outfall structures. Taxiway B will not include centerline lighting or taxiway edge lights but will have retroreflective taxiway edge markers installed as a part of this project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Eagle County Regional Airport's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database