Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dupage Water Commission
Construction of FW-1/25 Section 4 – 16", 20", and 24" water supply feeder main. Work generally includes, but is not limited to, water main construction (open-cut and trenchless), removal, relocation, and replacement of existing underground utilities, roadway reconstruction and paving, traffic control, landscape restoration, storm water pollution control and erosion control, and testing.
Posted Date
-
Due Date
Aug 5, 2026
Release: -
Dupage Water Commission
Close: Aug 5, 2026
Construction of FW-1/25 Section 4 – 16", 20", and 24" water supply feeder main. Work generally includes, but is not limited to, water main construction (open-cut and trenchless), removal, relocation, and replacement of existing underground utilities, roadway reconstruction and paving, traffic control, landscape restoration, storm water pollution control and erosion control, and testing.
AvailableDupage Water Commission
Work includes excavation, site utilities, concrete, precast, misc. Metals, metal roofing, siding, doors, coiling door, painting/coating, equipment, instrumentation, plumbing/process piping, hvac, and electrical.
Posted Date
May 22, 2026
Due Date
Jun 5, 2026
Release: May 22, 2026
Dupage Water Commission
Close: Jun 5, 2026
Work includes excavation, site utilities, concrete, precast, misc. Metals, metal roofing, siding, doors, coiling door, painting/coating, equipment, instrumentation, plumbing/process piping, hvac, and electrical.
Dupage Water Commission
Work generally includes, but is not limited to, 16-, 20, and 24" dia water main construction (open-cut), connections to adjacent contracts, meter station building construction (structural, architectural, piping, electrical, and controls), removal, relocation, and replacement of existing underground utilities, roadway reconstruction and paving, traffic control, landscape restoration, storm water pollution control and erosion control, and testing.
Posted Date
May 15, 2026
Due Date
Jun 9, 2026
Release: May 15, 2026
Dupage Water Commission
Close: Jun 9, 2026
Work generally includes, but is not limited to, 16-, 20, and 24" dia water main construction (open-cut), connections to adjacent contracts, meter station building construction (structural, architectural, piping, electrical, and controls), removal, relocation, and replacement of existing underground utilities, roadway reconstruction and paving, traffic control, landscape restoration, storm water pollution control and erosion control, and testing.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Dupage Water Commission
The Board of Commissioners meeting agenda for July 16, 2026, includes several key items for action. These involve authorizing a task order with Raftelis, Inc. for financial advisory services related to the Regional Source Water Initiative, approving business-related travel expenses for valve testing, and awarding a contract for construction of the WaterLink Meter Stations and Chemical Feed Building. Additionally, the agenda covers approval of various accounts payable invoices, an executive session to discuss security, personnel, and real estate acquisition, and the approval of ordinances regarding the acquisition of easements for providing water to the Village of Montgomery, Village of Oswego, and the United City of Yorkville.
The agenda focuses on the report of operations and construction status, and several resolutions including task order approvals with HDR Engineering, sole source provider authorization for pump control valve repair, and contract awards for geotechnical investigative services, West Transmission Main construction, and associated change orders. Additionally, old business addresses the clarification of tasks for the SCADA Improvement Project, and the meeting includes provisions for an executive session to discuss security, personnel, real estate, and litigation.
The Board of Commissioners discussed various administrative and construction-related items, including the acquisition of easements for water projects for the Village of Montgomery, Village of Oswego, and United City of Yorkville. They authorized travel expenses for commission employees, approved task orders for engineering and construction services such as geotechnical investigations and transmission main construction, and ratified high-lift pump repair services. Financial reports were reviewed, and executive sessions were held to discuss personnel matters, security procedures, property acquisitions, and pending litigation. Additionally, budget revisions and accounts payable were approved.
The committee reviewed an ordinance regarding a pipeline construction and amended license agreement with Commonwealth Edison for the WaterLink project. A resolution to review and potentially release closed executive session minutes was discussed. Additionally, authorization for business-related travel for commission employees to attend factory testing and the IFMA Conference was reviewed, alongside discussions concerning source water communication contracts and a memorandum of understanding.
The committee discussed Resolution No. R-33-26, which authorizes the purchase of three new vehicles, including two SUVs and one utility truck, for the fiscal year 2026/2027 through the Suburban Purchasing Cooperative to support field operations. The total cost is capped at $210,000, covering the vehicle purchases and ancillary equipment. Additionally, the agenda provided for an executive session to address matters related to security, personnel, real estate acquisition, property pricing, pending litigation, and review of closed meeting minutes.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Dupage Water Commission's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge