Learn more →Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
Posted Date
Dec 10, 2025
Due Date
Jan 14, 2026
Release: Dec 10, 2025
Close: Jan 14, 2026
Removal of approximately 92 LF of two 35"x24" arch-corrugated metal pipes (CMP) and the surrounding pavement. The Project includes the installation of two new 34"x53" elliptical reinforced concrete pipes (RCP), one being 67 LF and one being 73 LF, as well as two new concrete headwalls. Approximately 166 LF of guardrail will also be installed. The road will be restored after the new culvert is installed.
AvailableWork includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
AvailableWork includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Close: Dec 17, 2025
Work includes replacement of approx 780 LF of existing 8" DIP sewer line with 8" PVC/HDPE by open cut/pipe bursting, replacement of approx 2,630 LF of existing 8" DIP sewer line with 12" PVC/HDPE by open cut/pipe bursting, removal/replacement of nine (9) taps and service laterals on the sewer line, restoration of five (5) manholes to their original thickness, corrosion protection provision for the manholes through application of a corrosion resistant epoxy liner.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis