Sanitary Sewer - Section II RFP
Posted
Nov 10, 2026
Dec 1, 2026
Work includes approx. 2 EA construct sanitary sewer tap; 3,359 LF construct 8" pvc sanitary sewer pipe; 566 LF construct 8" pvc sanitary sewer pipe (over 15' depth); 2,536 LF construct 6" inch sanitary sewer pipe; 275 VF construct 54". I.D. sanitary manhole (22); 14 VF construct 6" diameter drop connection (4); 11 VF construct 8" diameter drop connection (1); 31 VF construct 6" sanitary sewer service riser; 3 EA construct 8" sanitary sewer pipe plug; 22 EA install external frame seal; 22 VF construct 54" manhole over existing sanitary sewer; 10 VF reconstruct sanitary sewer manhole (2); 120 TN construct aggregate bedding for trench stabilization (3" clean); 180 TN construct foundation rock for trench stabilization (type "b" rip rap); 450 SY install geotextile fabric for trench stabilization; 390 SY install bx1100 geogrid for trench stabilization.