2026 Street Reconstruction - SID #503 RFP
Posted
Oct 5, 2026
Oct 19, 2026
542 SY repair pavement, large area (ty OPW 4000); 368 SY repair pavement, small area (ty OPW 4000); 995 LF saw cut existing pavement, full depth; 50 Tn remove and replace faulty subgrade; 1 Ea adjust manhole to grade; 1 Ea replace curb inlet top with face armor.
