Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Diamondhead Water And Sewer District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Secretary / Treasurer
Executive Director
Utilities Maintenance Superintendent
Director of Operations
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Diamondhead Water And Sewer District
The Diamondhead Water and Sewer District is soliciting construction services for the Diamondhead Sewer Improvements Phase 3 project, which involves CIPP lining and gravity sewer replacement within Basin 3 in Diamondhead, Mississippi. The contract requires the contractor to furnish all labor, equipment, testing, and materials necessary to complete the work per the Contract Documents, and requires a 5% bid security plus 100% performance and payment bonds. Bids are due March 12, 2026, and the project is estimated between $1,000,000 and $5,000,000.
Posted Date
Jan 30, 2026
Due Date
Mar 12, 2026
Release: Jan 30, 2026
Diamondhead Water And Sewer District
Close: Mar 12, 2026
The Diamondhead Water and Sewer District is soliciting construction services for the Diamondhead Sewer Improvements Phase 3 project, which involves CIPP lining and gravity sewer replacement within Basin 3 in Diamondhead, Mississippi. The contract requires the contractor to furnish all labor, equipment, testing, and materials necessary to complete the work per the Contract Documents, and requires a 5% bid security plus 100% performance and payment bonds. Bids are due March 12, 2026, and the project is estimated between $1,000,000 and $5,000,000.
AvailableDiamondhead Water And Sewer District
Water system rehabilitation phase iv project requires the successful bidder to construct approximately 5,224 LF of 8" diameter PVC waterline , appurtenances and connection to the existing water system.
Posted Date
Sep 11, 2025
Due Date
Oct 9, 2025
Release: Sep 11, 2025
Diamondhead Water And Sewer District
Close: Oct 9, 2025
Water system rehabilitation phase iv project requires the successful bidder to construct approximately 5,224 LF of 8" diameter PVC waterline , appurtenances and connection to the existing water system.
Diamondhead Water And Sewer District
Water elevated storage tank no. 1 re-painting project requires the successful Bidder to mitigate previously defective painted exterior of its existing 500,000-gallon pedesphere style elevated water storage tank in accordance with the drawings, specifications and contract documents. The project work shall include cleaning, surface preparation, tank painting, site restoration and furnishing of all equipment required to complete, test, and make ready for use by the Owner all structures, equipment, and systems as specified in the Contract Documents.
Posted Date
Jun 11, 2025
Due Date
Aug 14, 2025
Release: Jun 11, 2025
Diamondhead Water And Sewer District
Close: Aug 14, 2025
Water elevated storage tank no. 1 re-painting project requires the successful Bidder to mitigate previously defective painted exterior of its existing 500,000-gallon pedesphere style elevated water storage tank in accordance with the drawings, specifications and contract documents. The project work shall include cleaning, surface preparation, tank painting, site restoration and furnishing of all equipment required to complete, test, and make ready for use by the Owner all structures, equipment, and systems as specified in the Contract Documents.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.