Runway 11L-29R Pavement Rehabilitation Project RFP
Aug 5, 2026
Closes
Aug 27, 2026
Project is comprised of surface treating the 10,245-foot by 150-foot runway, blast pads, paved shoulders, turnaround pads, and taxiway connectors d9 (a1), d east (a6), f (b5), b2 (b6), and b3 (b7) within the runway 11l-29r runway safety area (rsa). It also includes taxiway connectors b and h (b3) located between the two runways and within the runway 11l-29r rsa. This treatment is anticipated to consist of removal of foreign substances / contaminants, sealing of existing cracks, surface treatment, and application of pavement markings.