Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
Construct a landfill gas extraction system expansion. The work includes: Construction staking/system layout/surveying prior to construction. Installing below grade High-Density Polyethylene (HDPE) landfill gas (LFG) extraction wells. Installing below grade HDPE horizontal collectors. Installing below grade HDPE LFG laterals and header, air supply lines, and liquid conveyance lines. Installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances. Installing new pumps, including tubing, clamps, and related appurtenances. Connection of the Gas Collection and Control System (GCCS) Expansion to the existing GCCS. System start-up and testing. Conformance surveying. Providing as-built documentation (record drawings).
Posted Date
Apr 17, 2026
Due Date
May 21, 2026
Release: Apr 17, 2026
Dalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
Close: May 21, 2026
Construct a landfill gas extraction system expansion. The work includes: Construction staking/system layout/surveying prior to construction. Installing below grade High-Density Polyethylene (HDPE) landfill gas (LFG) extraction wells. Installing below grade HDPE horizontal collectors. Installing below grade HDPE LFG laterals and header, air supply lines, and liquid conveyance lines. Installing gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances. Installing new pumps, including tubing, clamps, and related appurtenances. Connection of the Gas Collection and Control System (GCCS) Expansion to the existing GCCS. System start-up and testing. Conformance surveying. Providing as-built documentation (record drawings).
AvailableDalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
July 4th, 2025 Fireworks Show.
Posted Date
Nov 11, 2024
Due Date
Dec 11, 2024
Release: Nov 11, 2024
Dalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
Close: Dec 11, 2024
July 4th, 2025 Fireworks Show.
Dalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
Work includes approx 85 LF 30" HDPE storm drain; 140 LF slip-lining existing storm drain; erosion and sedimentation control; 3 new pond outfall. See attached file.
Posted Date
Nov 25, 2024
Due Date
Dec 23, 2024
Release: Nov 25, 2024
Dalton-Whitfield Regional Solid Waste Management Authority/Dalton - Whitfield Landfill Authority
Close: Dec 23, 2024
Work includes approx 85 LF 30" HDPE storm drain; 140 LF slip-lining existing storm drain; erosion and sedimentation control; 3 new pond outfall. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database