Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Cumberland Community Improvement District
Replace all stamped asphalt crosswalks within the boundary of the district. There are a total of 47 crosswalks throughout the district to be replaced as a part of this project. The red stamped shall be milled out of each crosswalk (at a depth of approximately 2"). Once the asphalt is removed, it should be paved back with 12.5mm superpave asphalt mix then striped over with white thermoplastic markings. Both the asphalt and thermoplastic striping for crosswalks shall be per GDOT specifications.
Posted Date
Jul 7, 2025
Due Date
Aug 11, 2025
Release: Jul 7, 2025
Cumberland Community Improvement District
Close: Aug 11, 2025
Replace all stamped asphalt crosswalks within the boundary of the district. There are a total of 47 crosswalks throughout the district to be replaced as a part of this project. The red stamped shall be milled out of each crosswalk (at a depth of approximately 2"). Once the asphalt is removed, it should be paved back with 12.5mm superpave asphalt mix then striped over with white thermoplastic markings. Both the asphalt and thermoplastic striping for crosswalks shall be per GDOT specifications.
Cumberland Community Improvement District
The Cumberland Community Improvement District is seeking non-cost technical proposals for engineering design consulting services for the Cumberland Sweep Segment F project. The scope of work includes environmental documentation, stakeholder engagement, and the development of preliminary and final construction plans in compliance with Georgia DOT processes. The project features a 15% DBE participation goal and is expected to run from June 2025 through November 2028.
Posted Date
Mar 20, 2026
Due Date
Apr 21, 2026
Release: Mar 20, 2026
Cumberland Community Improvement District
Close: Apr 21, 2026
The Cumberland Community Improvement District is seeking non-cost technical proposals for engineering design consulting services for the Cumberland Sweep Segment F project. The scope of work includes environmental documentation, stakeholder engagement, and the development of preliminary and final construction plans in compliance with Georgia DOT processes. The project features a 15% DBE participation goal and is expected to run from June 2025 through November 2028.
AvailableCumberland Community Improvement District
Cumberland Community Improvement District seeks proposals for exterior landscape maintenance services in Cobb County, GA. The contract term is one year with two one-year renewal options. The scope includes maintenance of trees, plants, groundcovers, and lawn areas, with responsibilities for center island medians and areas up to 15 feet behind roadway shoulder curbs. Proposals must include evidence of insurability and bondability, and pricing must remain fixed throughout the contract term. A non-mandatory bidders conference is scheduled, and proposals are due by October 17, 2024.
Posted Date
-
Due Date
Oct 17, 2024
Release: -
Cumberland Community Improvement District
Close: Oct 17, 2024
Cumberland Community Improvement District seeks proposals for exterior landscape maintenance services in Cobb County, GA. The contract term is one year with two one-year renewal options. The scope includes maintenance of trees, plants, groundcovers, and lawn areas, with responsibilities for center island medians and areas up to 15 feet behind roadway shoulder curbs. Proposals must include evidence of insurability and bondability, and pricing must remain fixed throughout the contract term. A non-mandatory bidders conference is scheduled, and proposals are due by October 17, 2024.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Cumberland Community Improvement District
The Cumberland Community Improvement District's Bicycle Connectivity Implementation Plan establishes a comprehensive framework to enhance regional competitiveness and quality of life through improved bicycle infrastructure. The plan outlines three core strategies: marking existing shared-use paths with centerlines, implementing enhanced signage and wayfinding, and developing new urban trails, greenway trails, and trailheads. This initiative aims to create a 60-mile interconnected system, valued at over $100 million, to provide safe, connected, and aesthetically pleasing environments for pedestrians, cyclists, and multi-modal users, thereby fostering a walkable live, work, and play environment and connecting various community destinations. The intended outcomes include increased property values, tourism, improved air quality, and reduced healthcare costs.
Blueprint Cumberland 3.0 is a comprehensive vision and plan designed to transform the Cumberland area into a more walkable, dynamic, urban center and vibrant regional gateway. It focuses on three strategic pillars: Access, Connectivity, and Placemaking. The plan aims to make Cumberland a more accessible and attractive place to work and live, sustaining its growth as a regional commercial, residential, and entertainment destination.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Cumberland Community Improvement District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database