Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Crystal City Housing Authority
1. All popcorn on ceiling to be removed completely to surface of sheetrock. All cracks, broken, soft spots in sheetrock/studs must be replaced. Walls and ceiling must be textured and painted after all repairs (No spraying allowed to texture ceiling). a. Install smoke alarms in all bedrooms and one common area (near living room and kitchen area at hallway entrance). 2. All floor tiles must be removed in unit completely including water heater closet and pantries. All base trim removed and replaced with colonial base trim, caulked top and bottom, and painted. Kitchen cabinets on bottom must be finished with ¾ round trim or caulked properly. 3. Install complete door units and hardware to replace all damage interior/exterior door unit. All door/trims must be painted and caulked. Front and rear door combos must be replaced when damaged and advised by maintenance supervisor. 4. Replace all old and damage light fixtures, (inside/outside) all outlets cover, and no wires can be exposed. 5. All windows must work properly if inoperable/ damaged you must replace and secure entire window components. 6. Kitchen faucets must be replaced, including strainers, P-trap, cut-offs, and supply lines. Damage cabinets must be repaired or replaced and have all hardware, endcaps in place, and painted as required. 7. Storage rooms ceilings and walls must be replaced if damage and painted. Floor must be cleaned with no damage to its foundation. Door must have proper hardware. 8. Remove and install new utility washroom – washing machine outlet box with faucets. 9. Damage or rusted rangehood must be replaced. 10. Unit floor tile must be buffed and waxed.
Posted Date
Apr 18, 2025
Due Date
May 13, 2025
Release: Apr 18, 2025
Crystal City Housing Authority
Close: May 13, 2025
1. All popcorn on ceiling to be removed completely to surface of sheetrock. All cracks, broken, soft spots in sheetrock/studs must be replaced. Walls and ceiling must be textured and painted after all repairs (No spraying allowed to texture ceiling). a. Install smoke alarms in all bedrooms and one common area (near living room and kitchen area at hallway entrance). 2. All floor tiles must be removed in unit completely including water heater closet and pantries. All base trim removed and replaced with colonial base trim, caulked top and bottom, and painted. Kitchen cabinets on bottom must be finished with ¾ round trim or caulked properly. 3. Install complete door units and hardware to replace all damage interior/exterior door unit. All door/trims must be painted and caulked. Front and rear door combos must be replaced when damaged and advised by maintenance supervisor. 4. Replace all old and damage light fixtures, (inside/outside) all outlets cover, and no wires can be exposed. 5. All windows must work properly if inoperable/ damaged you must replace and secure entire window components. 6. Kitchen faucets must be replaced, including strainers, P-trap, cut-offs, and supply lines. Damage cabinets must be repaired or replaced and have all hardware, endcaps in place, and painted as required. 7. Storage rooms ceilings and walls must be replaced if damage and painted. Floor must be cleaned with no damage to its foundation. Door must have proper hardware. 8. Remove and install new utility washroom – washing machine outlet box with faucets. 9. Damage or rusted rangehood must be replaced. 10. Unit floor tile must be buffed and waxed.
Crystal City Housing Authority
Construction of basketball court backdrop fence. Work will consist of building a fence at the north & south side of the court 60 x 11 and east & west side of court corners 11 x 11, and also the repainting of the court lines at both locations.
Posted Date
Mar 27, 2025
Due Date
Apr 9, 2025
Release: Mar 27, 2025
Crystal City Housing Authority
Close: Apr 9, 2025
Construction of basketball court backdrop fence. Work will consist of building a fence at the north & south side of the court 60 x 11 and east & west side of court corners 11 x 11, and also the repainting of the court lines at both locations.
Crystal City Housing Authority
Complete removal of popcorn ceiling, texture and paint. Paint all walls and window trims replacing any damaged sheetrock, studs & wood. Complete removal of cabinets/countertops along with sink and all plumbing attachments and replacing any damaged sheetrock, studs & wood. Relocation of ice machine, fridge, xerox copier and silver metal shelve to new breakroom assuring all wiring and devices are in working order at new location. Removal of entire floor tile (all layers) and baseboards and replacing damaged floor/ baseboards (sheetrock, studs & wood at bottom) install new floor tile/baseboard caulked & painted buffed & waxed. Removal/installing new window blinds. Disposal of all debris.
Posted Date
Jul 24, 2024
Due Date
Aug 5, 2024
Release: Jul 24, 2024
Crystal City Housing Authority
Close: Aug 5, 2024
Complete removal of popcorn ceiling, texture and paint. Paint all walls and window trims replacing any damaged sheetrock, studs & wood. Complete removal of cabinets/countertops along with sink and all plumbing attachments and replacing any damaged sheetrock, studs & wood. Relocation of ice machine, fridge, xerox copier and silver metal shelve to new breakroom assuring all wiring and devices are in working order at new location. Removal of entire floor tile (all layers) and baseboards and replacing damaged floor/ baseboards (sheetrock, studs & wood at bottom) install new floor tile/baseboard caulked & painted buffed & waxed. Removal/installing new window blinds. Disposal of all debris.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track Crystal City Housing Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database