REQUEST FOR QUALIFICATIONS AND PROPOSALS MILLS FOREBAY TANKS REPLACEMENT Engineering Design Services and Services During Bidding and Construction
Posted
Nov 9, 2026
Dec 4, 2026
This solicitation is for professional engineering and related services for planning, design, permitting support, preparation of plans, specifications and estimates, bidding assistance, and engineering services during construction for replacement of the two Mills Forebay potable-water storage tanks in La Crescenta, California. The District (Crescenta Valley Water District) will use a fair, competitive selection process and may consider demonstrated competence, professional qualifications, technical approach, and proposed fee. The selected prime consultant will be responsible for a coordinated multidisciplinary team (civil, structural, geotechnical, corrosion/coatings, mechanical, electrical, instrumentation and controls/SCADA, surveying, environmental/permitting, constructability, cost-estimating, and construction-support capabilities). Project objectives include replacing two existing ~20,000-gallon welded-steel tanks with reliable, code-compliant storage facility(ies); developing and comparing feasible replacement concepts (tank configuration, materials, foundation, piping, appurtenances, ventilation, cathodic protection, access and safety systems, sequencing); maintaining potable-water service and operational flexibility during demolition, construction, testing, disinfection, and startup; addressing residential-site constraints (dust, noise, traffic, containment, work-hours, neighbor protection); preparing complete, coordinated and biddable construction documents with independent QC and a defensible engineer's estimate; and supporting a fair, open construction bidding process and providing responsive engineering support through construction and closeout. The RFQ&P includes tasks for project management, records review/survey/investigation/data collection (including hazardous-materials sampling and geotechnical investigation), basis-of-design and alternatives analysis, environmental/permitting/agency coordination, final design and construction documents, construction procurement assistance, and engineering services during construction. Deliverables include electronic searchable PDFs and native editable files for milestone submittals (30% Basis of Design, 60%, 90%, 100% bid-ready), estimates, permit submittals, bid support, and construction-phase documentation. The solicitation includes a tentative procurement schedule (RFQ&P issued November 9, 2026; optional site walk November 17, 2026; questions due November 19, 2026; proposals due December 4, 2026) and evaluation criteria (project understanding, technical approach, key personnel qualifications, relevant experience, schedule/availability, and fee reasonableness). Insurance, licensing, indemnity, prevailing-wage/DIR compliance for covered field work, and District contract requirements apply. All questions must be submitted in writing to the designated District contact; material changes will be issued by addendum to registered proposers.