Renovation of Summer Camp Bathhouse RFP
Posted
Oct 2, 2026
Oct 23, 2026
Project includes installation of two (2) double hand wash sinks with storage; install ceiling with sound proofing; construct six (6) enclosed toilet stalls three (3) on each side; replace six (6) total toilets three (3) on each side; install new recessed light fixtures; regrade doorway/entry grading for accessibility; install two (2) enclosed showers one (1) each side including shower venting; install one (1) new on-demand water heater repaint both sides of the bathhouse.

