Discover opportunities months before the RFP drops
Learn more →Director of Financial Services Division
Work Email
Employing Organization
Board meetings and strategic plans from Anthony Bacarisse's organization
The community engagement meeting focused on the Vince Bayou Drainage Improvements Project. Key topics included a background of the Flood Control District, its mission, and its role in flood risk reduction across various watersheds in Harris County. The presentation detailed the preliminary engineering stage of the Vince Bayou project, which involves evaluating alternative sites for storm water detention basins and channel widening to mitigate flood impacts. Information was shared regarding historical flooding data, project timelines, and strategies for maximizing flood mitigation benefits while being sensitive to community and natural values.
The virtual public meeting focused on the construction update for the South 75th Bridge, which is a key component of Project Braze. The discussion included project objectives to improve flood mitigation by replacing the existing bridge with a higher, wider, and longer structure to increase channel capacity. Key topics covered were the construction schedule, planned detours for commuter and pedestrian traffic, and the environmental considerations for preserving local vegetation and trees in the area. Additionally, the district provided information on the broader Project Braze initiative and addressed community questions regarding trails and ongoing flood damage reduction efforts.
The virtual community engagement meeting focused on providing project status updates for the Inwood Forest stormwater detention basin. Discussions included the primary purpose of the project, which is flood damage reduction for area neighborhoods, as well as the design status, permitting process, and upcoming construction phases. Presenters also addressed community inquiries regarding tree protection and preservation, future potential for recreational amenities such as trails, and the identification of encroachments on public property.
The virtual meeting focused on the Flood Risk Reduction Project near the Highlands Reservoir. Key discussion topics included an overview of the district's role in flood damage reduction, the impact of extreme rainfall and local soil characteristics on flooding, and the implementation of the 2018 bond program projects. The technical presentation detailed the feasibility study process, including the evaluation of channel modifications and stormwater detention basins, and explained the terminology regarding storm event probabilities. The meeting also outlined next steps for the project, specifically moving into the preliminary engineering phase to refine the preferred solution.
The virtual meeting focused on the Arbor Oaks Stormwater Detention Basin project in the White Oak Bayou watershed. Discussions covered project background, including the voluntary buyout program, funding partnerships such as the Natural Resources Conservation Service grant, and the overall project life cycle. Technical details were provided on the proposed wet bottom basin design, expected storage capacity, and the anticipated construction timeline. The session also addressed the broader context of flood risk reduction, the importance of equity in infrastructure investments, and potential recreational amenities.
Extracted from official board minutes, strategic plans, and video transcripts.
Decision makers at Harris County Flood Control District
Enrich your entire CRM with verified emails, phone numbers, and buyer intelligence for every account in your TAM.
Keep data fresh automatically
What makes us different
Direct Phone
Jorge Alba
Director, Engineering Division
Key decision makers in the same organization