W8 Drainage Improvements at Ponchatoula Cemetery [FY2026]
-
Closes
Aug 6, 2026
Work consists of installation and maintenance of construction and traffic signage and implementation of erosion control and stormwater management measures (swmmp) required for mobilization to the project site, and related work. Utilizing a steel sheet pile bulkhead, and includes: mobilization; miscellaneous clearing and sitework; unclassified demolition and clearing of the existing cmpa; furnishing and installing approximately 200 linear feet of pz-40 hot-rolled steel sheet pile (40 vertical feet) with cross bracing and steel channel pile cap; installation of reinforced portland cement concrete headwalls (12-inch thick, including footings); hauled-in and compacted select backfill; 55-pound limestone rip-rap (24-inch thick); chain link fencing (4-foot high); flowable fill; no. 57 limestone; and slab sodding with root zone material and related work.