CANBus Multiplex Trainer RFP
Posted
Nov 23, 2026
Dec 7, 2026
The purpose of these specifications is to describe a CANBus Multiplex Trainer for instructional, Maintenance, and technical training needs. CANBus Multiplex Trainer
Track open bid opportunities, contracts, public meetings, and key contacts for Pennsylvania Department of Transportation.
Active opportunities open for bidding
Posted
Nov 23, 2026
Dec 7, 2026
The purpose of these specifications is to describe a CANBus Multiplex Trainer for instructional, Maintenance, and technical training needs. CANBus Multiplex Trainer
Posted
Nov 23, 2026
Dec 17, 2026
The description and location of the project is as follows: For the bridge preservations, paving, drainage, guide rail, curb and sidewalk, signing and pavement markings, and other miscellaneous construction, all within a length of 4,471.08 linear feet (0.847 miles) as indicated on the approved drawings included in the bid package for CORAOPOLIS-NEVILLE ISLAND BRIDGE, SHADES RUN BRIDGE NO. 3, TURTLE CREEK BRIDGE NO. 19, and SUTERSVILLE BRIDGE, in ALLEGHENY and WESTMORELAND COUNTIES, MUNICIPALITY OF MONROEVILLE, CORAOPOLIS and SUTERSVILLE BOROUGHS, NEVILLE, PENN HILLS, ELIZABETH, PENN and SEWICKLEY TOWNSHIPS, Commonwealth of Pennsylvania. This project being situated as follows: Coraopolis-Neville Island Bridge: From a point approximately 140 feet north of Fifth Avenue (State Route 51) at Station 1+35 to a point approximately 40 feet east of Von Stein Lane at Station 23+00. Shades Run Bridge No. 3: From a point approximately 710 feet east of Lincoln Avenue Extension at Station 5+00 to a point approximately 40 feet west of Lincoln Avenue Extension at Station 13+37. Turtle Creek Bridge No. 19: From a point approximately 175 feet north of Sycamore Lane at Station 6+00 to a point approximately 35 feet south of Westmoreland Heritage Trail at Station 11+66. Sutersville Bridge (State Routes 2020 and 3045): From a point approximately 110 feet south of Blythedale Road (State Route 2017) at Station 8+73 to a point approximately 80 feet east of First Avenue (State Route 3039) at Station 21+78. County: Allegheny Municipality: CORAOPOLIS District: 11 SR: 7420 Section: LOC State Type of Work: BRIDGE Project Cost Range: $10,000,000.00 - $12,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS
Posted
-
Dec 10, 2026
Replacement of the existing structure with a single-span composite prestressed concrete plank beam bridge over Tannery Creek including removal of existing superstructure, saw cutting existing abutments, GRS abutments, roadway resurfacing including milling, base and wearing courses, guide rail upgrades, rock scour protection, reconstruction of existing stormwater swale, and other related work within an overall length of 998 LF (0.189 miles). See outside link.
Posted
Nov 12, 2026
Dec 3, 2026
Mill and resurface, base repairs, guide rail upgrades, bridge preservation, sign upgrades, rumble strips and other miscellaneous construction. See outside link.
Posted
Nov 10, 2026
Dec 3, 2026
Slope stabilization. Work includes clearing and grubbing; 3,037 CY of Cl 1 excavation; 718 LF of saw cutting; 23 CY of Cl 2 excavation; 763 SY of 12" depth subbase; 2,650 SY of superpave asphalt mixture design, wearing course; 1,915 SY of milling of asphalt pavement surface; 18 LF of 18" RCP pipe; 77 LF of 18" RCP pipe; 34 LF of 18" type I corrugated galvanized steel pipe; 37 LF of 24" type I corrugated galvanized steel pipe; 799 LF of type 31-s guide rail; 9 CY of type A gabions. See outside link.
Posted
Nov 9, 2026
Dec 10, 2026
This project consists of a bridge deck replacement of a 35-foot single span prestressed concrete adjacent box beam bridge and other miscellaneous construction. Work includes clearing and grubbing; 341 CY of Cl 1 excavation; 54 LF of saw cutting; 29 CY of Cl 3 excavation; 734 SY of superpave asphalt mixture design, base course; 734 SY of 6" depth subbase; 100 LF of type 31-S guide rail; seeding and soil supplements; pavement markings. See outside link.
Posted
Nov 20, 2026
Dec 17, 2026
The description and location of the project is as follows: For the bridge preservation of two multi-span structures including deck overlay, joint replacement, concrete repairs, paint, and other miscellaneous construction, all within a length of 2,500 linear feet (0.47 miles) as indicated on the approved drawings included in the bid package for STATE ROUTE 0018, SECTION B62, in BEAVER COUNTY, NEW BRIGHTON BOROUGH and CITY OF BEAVER FALLS, Commonwealth of Pennsylvania. This project being situated as follows: From points approximately 395 feet north of 5th Street at Segments 0600/0601, Offsets 0405/0430 (Station 593+00/592+00) to approximately 340 feet south of 4th Street at Segments 0610/0611, Offsets 2167/2217 (Station 618+00). County: Beaver Municipality: NEW BRIGHTON District: 11 SR: 18 Section: B62 State Type of Work: BRIDGE Project Cost Range: $10,000,000.00 - $12,499,999.99 Federal Project Status: PENNDOT Oversight NHS
Posted
Nov 20, 2026
Dec 17, 2026
This rapid delivery project is for the pavement improvements of the following roadways located in Lackawanna County: SR 11 (Main Street/Birney Avenue/Pittston Avenue) from the Luzerne County line to Sanders Street, as well as SR 3012 (Oak Street) from Keyser Avenue (SR 3011) to Main Street (SR 3013), as indicated on the approved drawings included in the bid package for STATE ROUTE 0011, SECTION S01, in LACKAWANNA COUNTY, MOOSIC BOROUGH AND CITY OF SCRANTON from Segment 0010 Offset 0000 to Segment 0101 Offset 2843 and in Taylor Borough, SR 3012 from Segment 0010 Offset 0000 to Segment 0030 Offset 1398. County: Lackawanna Municipality: SCRANTON District: 04 SR: 11 Section: S01 State Type of Work: RESURFACING/OVERLAYS Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: Non - Federal (100% State)
Posted
Nov 19, 2026
Dec 10, 2026
The project consists of landslide repairs with tangent caissons and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 3081, SECTION A07, in ALLEGHEGY COUNTY CORAOPOLIS BOROUGH from approximately Montour Street Extension and Woodcrest Avenue at Segment 0030 Offset 0471 to approximately Montour Street Extension and Grace Street at Segment 0030 Offset 1466. County: Allegheny Municipality: CORAOPOLIS District: 11 SR: 3081 Section: A07 State Type of Work: SLIDES CORRECTION Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: Non - Federal (100% State)
Posted
Nov 19, 2026
Dec 10, 2026
The description and location of the project is as follows: For the milling, resurfacing, shoulder repair, base repair, drainage, guide rail, pavement marking, and other miscellaneous construction, all within a length of 30,596 linear feet (5.79 miles) as indicated on the approved drawings included in the bid package for GROUP PROJECT 111-27-7135-2 in ALLEGHENY COUNTY, WEST VIEW BOROUGH, ROSS TOWNSHIP, AND MCCANDLESS TOWNSHIP, Commonwealth of Pennsylvania. This project being situated as follows: SR 0019, Section A89 (Perry Highway) - 100 feet North of West View Park Drive (0460/0690) extending North to 75 feet South of Lillian Road (0500/1891). SR 4070, Section A22 (Ingomar Road) - Highland Road (0010/0000) extending East to SR 4031 (Babcock Blvd) (0080/2175). County: Allegheny Municipality: ROSS T District: 11 SR: 19 Section: A89 State Type of Work: RESURFACING/OVERLAYS Project Cost Range: $5,000,000.00 - $7,499,999.99 Federal Project Status: Non - Federal (100% State)
Key metrics and characteristics
City
The city where this buyer is located.
Harrisburg
County
The county where this buyer is located.
Dauphin
Address
Physical address of this buyer.
Keystone Building
Zip Code
Postal code for this buyer's location.
17120
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
Startup Friendliness
How often this buyer champions startups and early adoption.
Latest Budget Year
Unlock to view
Operating Budget
Unlock to view
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
AI-ranked best-fit opportunities before bid boards
Auto-drafted, compliance-ready outlines & boilerplate
Competitor & pricing intel from past awards
Procurement guidance and navigation tips.
These are suggested options, not confirmed memberships or past purchases. Our team can help confirm the right purchasing path for this agency.



Track vendor wins and renewal opportunities
This contract is for the ECMS Highway Construction project ID 121952, involving the replacement of three structures on SR-1012 (Hatten Road) over I-80 and Fivemile Run, and the existing structure carrying SR-1006 (Sulgar Road) over I-80, along with other miscellaneous construction in Jefferson County, Pennsylvania. The agreement is between the Commonwealth of Pennsylvania (The Department) and MEKIS Construction Corporation, with an effective start date of December 21, 2026, and a required completion date of May 16, 2029. The total contract amount is $31,297,023.33, detailed through numerous bid items and subject to various special provisions, performance, payment, and insurance terms.
This contract outlines the terms for highway construction, specifically the replacement of the SR 2018 bridge over Otter Creek in York County, Pennsylvania. Kinsley Construction, LLC will perform the work for a total amount of $1,172,801.47. The project is scheduled to begin on December 7, 2026, with a required completion date of November 22, 2027, and includes various construction activities, material specifications, and adherence to environmental and federal regulations.
This contract is for highway construction services, specifically focusing on the repair and/or replacement of damaged guiderail, cable guide fence, median barrier, railings, and right-of-way fences across various routes in Allegheny, Beaver, and Lawrence Counties, Pennsylvania. The agreement is between the Commonwealth of Pennsylvania (represented by PennDOT) and Penn Line Service, Inc., and is effective from November 20, 2026, until December 1, 2028. The total contract value is $2,246,059.84.
This contract, identified as ECMS Highway Construction Contract 120942, is awarded to J. D. Eckman, Inc. by the Commonwealth of Pennsylvania, Department of Transportation. The project involves district-wide MS4 and wetland mitigation repairs, specifically focusing on the repair of sixteen stormwater control measures across Bucks, Chester, and Montgomery Counties. The anticipated start date for the work is December 21, 2026, with a required completion date of April 23, 2030. The total contract amount is $2,580,172.25.
This contract, identified as ECMS Highway Construction Contract 120976, is for the conversion of Linden Street from one-way southbound to two-way operation in Northampton County, City of Bethlehem. The work involves milling and overlay, signing, pavement marking, and traffic signal modifications. The agreement was made on November 19, 2026, with an anticipated start date (NTP) of December 21, 2026, and a required completion by September 15, 2027. The total contract amount is $1,306,132.61. Grace Industries, Inc. is the contractor, and the City of Bethlehem of the Commonwealth of Pennsylvania Northampton County is the Sponsor/buyer.
Board meetings and strategic plans from Pennsylvania Department of Transportation
The Pennsylvania 2050 Freight Movement Plan outlines a comprehensive strategy to guide freight transportation development in the state. It focuses on six key areas: aligning freight initiatives with land use and economic development, enhancing freight mobility, improving analytical tools and processes, bolstering operations and safety, promoting environmental stewardship and system resiliency, and strengthening institutional and organizational capacity within PennDOT. The plan aims to improve freight infrastructure, data analysis, safety, sustainability, and collaboration among stakeholders to support Pennsylvania's economic growth and mobility needs.
The Commission discussed several key items including updates on the local bridge bundling pilot program, the status of the Transportation Finance Plan and potential funding legislation, and the impact and repair plans regarding the I-81/Route 22/322 interchange incident. Adjustments to the 2013 Highway and Bridge Twelve Year Program were reviewed and accepted. The modernization of the public involvement process was presented, featuring proposed improvements such as an updated website, online surveys, and modernized outreach tools. Geographic Information Systems (GIS) advancements were demonstrated, including updates to the Decade of Investment website. Additionally, reports were provided on the Transportation Advisory Committee activities, administrative budget updates, safety administration initiatives, and the Public-Private Transportation Partnership Board's ongoing projects.
Public-sector contacts connected to Pennsylvania Department of Transportation.
Native sync to Salesforce & HubSpot
See expiring contracts, renewal timing, pricing history, and competitor awards, then sync the data to your CRM.
Expiring contracts, renewals, and award history
Competitor contract data and source files
Budget and spend signals to prioritize accounts
Native sync to Salesforce and HubSpot
The commission reviewed adjustments to the 12-Year Transportation Program, including funding changes for the I-83 South Bridge project and federal grant application efforts. Updates were provided on workforce development, the National Electric Vehicle Infrastructure program, Highway Occupancy Permit process improvements, and updated flood design standards. The meeting also addressed administrative budget reports, Driver and Vehicle Services updates such as CDL testing modifications, and safety initiatives regarding roadway fatalities. Furthermore, the commission reviewed a presentation on District 10-0 engineering projects, corridor improvements, and bridge replacements, alongside reports on Shared Ride Program sustainability and Rail Freight Grant applications.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Pennsylvania Department of Transportation meetings, strategic plans, and budget discussions before the public bid appears.
Early signals from meeting minutes and plans
Vendor mentions and competitor tracking
Decision timeline from discussion to RFP
Quotable insights from buyer leadership