Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Columbus Power & Water
Purchase one 75-foot aerial bucket truck with utility body. See attached file.
Posted Date
-
Due Date
Jun 4, 2026
Columbus Power & Water
Close: Jun 4, 2026
Purchase one 75-foot aerial bucket truck with utility body. See attached file.
AvailableColumbus Power & Water
Purchase one (1) super duty extended cab and chassis with a minimum GVW rating of 19,500 pounds equipped with utility service body and 50-foot aerial tower. See attached file.
Posted Date
May 6, 2026
Due Date
Jun 4, 2026
Release: May 6, 2026
Columbus Power & Water
Close: Jun 4, 2026
Purchase one (1) super duty extended cab and chassis with a minimum GVW rating of 19,500 pounds equipped with utility service body and 50-foot aerial tower. See attached file.
AvailableColumbus Power & Water
Scope of Service: Power lines will need covered. Vendor will need to check in and out with appropriate site personnel. Safety equipment may need to be set up by vendor. All lifts/equipment needed will be provided by vendor. Remaining roofing materials will need to be removed. Will need to install perimeter wood nailer to height of new insulation. Install 2-layers of poly iso in adhesive to reach an R30 insulation rating. Install fully adhered PVC membrane. Install 24 GA kynar gravel stop/drip edge in coated metal. Clean up and remove all job-related equipment, material, trash and debris.
Posted Date
-
Due Date
May 11, 2026
Release: -
Columbus Power & Water
Close: May 11, 2026
Scope of Service: Power lines will need covered. Vendor will need to check in and out with appropriate site personnel. Safety equipment may need to be set up by vendor. All lifts/equipment needed will be provided by vendor. Remaining roofing materials will need to be removed. Will need to install perimeter wood nailer to height of new insulation. Install 2-layers of poly iso in adhesive to reach an R30 insulation rating. Install fully adhered PVC membrane. Install 24 GA kynar gravel stop/drip edge in coated metal. Clean up and remove all job-related equipment, material, trash and debris.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge