Desmet Wastewater Collection System Inspection and Repair, Phase 2
Jul 30, 2026
Closes
Aug 31, 2026
Perform sewer lateral connections and manhole repairs. Review lateral launch videos and assess needed repairs, chemically grout and seal laterals with PVC compatible materials, review manhole inspection reports, conduct manhole inspections and identify needed repairs, provide a manhole inspection report with proposed solutions for repair or replacement, clean, grout, and repair manholes. A bid item is included for excavation, trenching, backfill, and compaction to provide for any needed repairs requiring excavation.