Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Clay County Housing Authority's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Clay County Housing Authority
Lawn mowing services at its apartments.
Posted Date
-
Due Date
Feb 6, 2026
Release: -
Clay County Housing Authority
Close: Feb 6, 2026
Lawn mowing services at its apartments.
AvailableClay County Housing Authority
Work includes abatement of the existing ACM flooring, mastic and drywall. Remove the existing hot water baseboard heating system and patch slab. Replace the sanitary piping. Replace domestic water piping and fixtures. Install washer box and dryer connection. Replace the shutoff valve on the main water line. Replace the kitchen cabinets, sink and countertop. Replace the load center and wiring in the unit and all devices and light fixtures. Install new single water heater for both units, remove the mini split units and install a new ducted HVAC system and soffits.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Clay County Housing Authority
Close: Feb 5, 2026
Work includes abatement of the existing ACM flooring, mastic and drywall. Remove the existing hot water baseboard heating system and patch slab. Replace the sanitary piping. Replace domestic water piping and fixtures. Install washer box and dryer connection. Replace the shutoff valve on the main water line. Replace the kitchen cabinets, sink and countertop. Replace the load center and wiring in the unit and all devices and light fixtures. Install new single water heater for both units, remove the mini split units and install a new ducted HVAC system and soffits.
AvailableClay County Housing Authority
IL-65-1/Flora (Units 213/215 Sycamore): Work includes abatement of existing ACM flooring, mastic, and drywall. Remove the existing hot water baseboard heating system and patch the slab. Replace the sanitary piping below slab and in the walls and extend to 5' on the exterior to a new two-way cleanout. Install new toilet, lavatory and tub. Install a washer box for the laundry area. Replace the shutoff valve on the main water line. Replace the existing kitchen cabinets, sink, and countertop. Install a new range hood. Install a new sink base in the bathroom, new medicine cabinet and toilet accessories, Remove the existing through wall unit receptacle and replace with a standard duplex receptacle. Remove the accordion doors from the bedroom and closets. Replace the pocket door to the bathroom. Install new vinyl plank flooring, patch and skim coat walls, paint the entire unit. Install a lockable access panel in the kitchen for access to the plumbing for the tub. Install a new solid surface tub surround with grab bars. Remove and replace the existing furnace and water heaters. IL-65-5/Flora (Montgomery Court): Work includes removal and replacement of the existing exterior dwelling unit doors and hardware. Install storm doors on the units except for the two-story family units. Replace the hardware on the storage units and paint the storage unit and mechanical unit doors. Remove and replace the existing porch lights with fixtures provided by the PHA.
Posted Date
Dec 19, 2024
Due Date
Jan 28, 2025
Release: Dec 19, 2024
Clay County Housing Authority
Close: Jan 28, 2025
IL-65-1/Flora (Units 213/215 Sycamore): Work includes abatement of existing ACM flooring, mastic, and drywall. Remove the existing hot water baseboard heating system and patch the slab. Replace the sanitary piping below slab and in the walls and extend to 5' on the exterior to a new two-way cleanout. Install new toilet, lavatory and tub. Install a washer box for the laundry area. Replace the shutoff valve on the main water line. Replace the existing kitchen cabinets, sink, and countertop. Install a new range hood. Install a new sink base in the bathroom, new medicine cabinet and toilet accessories, Remove the existing through wall unit receptacle and replace with a standard duplex receptacle. Remove the accordion doors from the bedroom and closets. Replace the pocket door to the bathroom. Install new vinyl plank flooring, patch and skim coat walls, paint the entire unit. Install a lockable access panel in the kitchen for access to the plumbing for the tub. Install a new solid surface tub surround with grab bars. Remove and replace the existing furnace and water heaters. IL-65-5/Flora (Montgomery Court): Work includes removal and replacement of the existing exterior dwelling unit doors and hardware. Install storm doors on the units except for the two-story family units. Replace the hardware on the storage units and paint the storage unit and mechanical unit doors. Remove and replace the existing porch lights with fixtures provided by the PHA.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.