West Memphis - Stormwater Pump Station Modifications RFP
Aug 11, 2026
Closes
Aug 26, 2026
Work includes removingand storing an existing stormwater pump and appurtenances,constructing new concrete headwall systems and the associatedfacilities on both sides of the road crossing, and resetting the pumpstation after headwalls have been completed. Replacing a retaining wall system with a newconcrete headwall system on thedownstream side of the roadcrossing. Removing and storing existing stormwater pumps and appurtenances, constructing new concrete headwall systems on both sides of theroad crossing, and resetting of the pump stations after headwallshave been completed. Hardscapeimprovements include resurfacing, and installing new curb, gutter and sidewalks in the area.
