Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Waupun
Project consists of bituminous milling, pulverizing, and bituminous paving of existing streets.
Posted Date
May 13, 2026
Due Date
Jun 4, 2026
Release: May 13, 2026
City of Waupun
Close: Jun 4, 2026
Project consists of bituminous milling, pulverizing, and bituminous paving of existing streets.
AvailableCity of Waupun
110 LF of sanitary sewer (8" PVC) along with associated sanitary lateral replacement; 1,000 LF of water main (8" PVC) with associated water service replacement; 850 LF of storm sewer along with associated storm lateral installation work; 7,000 SY aggregate base installation; 6,400 SY of asphalt pavement; 1,700 SF of concrete sidewalk; 700 LF concrete curb and gutter; 1,900 sf concrete driveway areas; 1,000 SF colored concrete areas; as well as all related work including unclassified excavation, erosion control, traffic control, topsoiling, seeding, and site cleanup.
Posted Date
Mar 13, 2026
Due Date
Mar 26, 2026
Release: Mar 13, 2026
City of Waupun
Close: Mar 26, 2026
110 LF of sanitary sewer (8" PVC) along with associated sanitary lateral replacement; 1,000 LF of water main (8" PVC) with associated water service replacement; 850 LF of storm sewer along with associated storm lateral installation work; 7,000 SY aggregate base installation; 6,400 SY of asphalt pavement; 1,700 SF of concrete sidewalk; 700 LF concrete curb and gutter; 1,900 sf concrete driveway areas; 1,000 SF colored concrete areas; as well as all related work including unclassified excavation, erosion control, traffic control, topsoiling, seeding, and site cleanup.
City of Waupun
Work includes approx. 9,130 SY of topsoil placement and grading; 9,130 SY of seeding/fertilizing/mulching; 3,060 SY of erosion matting (undistributed); 5,100 LF of 30" concrete curb/gutter; 1,160 SF of concrete driveway (6" thick/6" base); 700 SF of asphalt driveway (3" thick/6" base) remove and replace; 12,230 SF of concrete sidewalk (4" thick); 11,485 SY of dense graded base (4" thick); 11,485 SY of breaker run (8" thick); 9,565 SY of asphaltic binder (2 1/2" thick) (2026); 9,455 SY of asphaltic surface (1-3/4" thick) (2027); 11,485 SY of stabilization fabric (type SAS); 1,200 SF of Styrofoam pipe insulation (undistributed); 335 LF of HDPE storm sewer (18" ID); 300 LF of RCP storm sewer (12" ID); 800 LF of PVC watermain (8" ID).
Posted Date
Feb 10, 2026
Due Date
Feb 26, 2026
Release: Feb 10, 2026
City of Waupun
Close: Feb 26, 2026
Work includes approx. 9,130 SY of topsoil placement and grading; 9,130 SY of seeding/fertilizing/mulching; 3,060 SY of erosion matting (undistributed); 5,100 LF of 30" concrete curb/gutter; 1,160 SF of concrete driveway (6" thick/6" base); 700 SF of asphalt driveway (3" thick/6" base) remove and replace; 12,230 SF of concrete sidewalk (4" thick); 11,485 SY of dense graded base (4" thick); 11,485 SY of breaker run (8" thick); 9,565 SY of asphaltic binder (2 1/2" thick) (2026); 9,455 SY of asphaltic surface (1-3/4" thick) (2027); 11,485 SY of stabilization fabric (type SAS); 1,200 SF of Styrofoam pipe insulation (undistributed); 335 LF of HDPE storm sewer (18" ID); 300 LF of RCP storm sewer (12" ID); 800 LF of PVC watermain (8" ID).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Avoid sole source unless the item is truly unique/patented and the City Administrator will sign a detailed justification.
Coops: Start with a cooperative purchase via Sourcewell or OMNIA Partners to move quickly without formal bidding.
Entity: City of Waupun (WI)
Use is rare; deprioritize.
Board meetings and strategic plans from City of Waupun
The Council conducted its organizational meeting, which included the administration of the Oath of Office to newly re-elected officials. Key actions included the election of a Council President, the establishment of the meeting schedule for the Common Council and Committee of the Whole, the designation of an official city newspaper, the formal adoption of a resolution for public depositories and withdrawal of city funds, and the approval of various Mayoral appointments to local boards, committees, and commissions.
The board discussed and approved funding applications for exterior building improvements at 313 E Main Street and 309-311 E Main Street. Updates were provided regarding the Waupun Business Alliance, including a planned community job fair, and the City Administrator reported on the Main Street designation project, upcoming community events like the Spring Wine Walk, and updates on back alley infrastructure bids and Carver Flats ribbon-cutting. Additionally, the board reviewed financial statements and outstanding grant applications.
The board discussed the amendment of parking limitations related to handicap stalls following the relocation of the community center. Significant consideration was given to the Alley Reconstruction Project, encompassing both N. Mill St. to N. Madison St. and N. Madison St. to Fond Du Lac St., with the review and recommendation of the low responsive bid from Kopplin & Kinas, Inc. totaling $1,741,299.60. Additionally, the department report for March provided an overview of various maintenance and operational activities.
The commission reviewed year-to-date financial reports and received operational updates from the General Manager, Electric Superintendent, and Treatment Facilities Superintendent. Key topics included the implementation of an outage management system, progress on infrastructure projects, maintenance activities, and the reporting of algal byproduct production. The 2025 financial statement audit was presented, resulting in an unmodified opinion. Additionally, the commission received an educational presentation on utility financing via revenue bonds, approved 2026 budget amendments for electric, water, and sewer funds, and authorized the solicitation of bids for high-side breakers.
The board discussed the closure of the Waupun Public Library Special Fund account and the termination of manual checking procedures. Key agenda items included the acceptance of a gift from the Carnegie Corporation of New York, the authorization of expense payments, and the librarian's monthly report covering budget, statistics, and staffing updates. Furthermore, the board recognized a member's service, reviewed a new KPI dashboard framework, discussed employment practice liability insurance, approved a job description for the Library Director, and adopted a standardized hiring timeline and process for the vacancy.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Waupun's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge