Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Springfield
Work includes approx. 8,000 LF of no. 8AWG, 5kV, L-824, type C cable, installed in conduit; 7,400 LF of no. 6AWG, solid bare copper counterpoise wire, installed in trench; 4,500 LF of 1w-2" schedule 40 PVC electrical conduit, installed in trench; 3,000 LF of 2w-2" schedule 40 PVC electrical conduit, installed in trench; 110 LF of 1w-2" schedule 80 HDPE conduit, directionally bored.
Posted Date
Mar 18, 2026
Due Date
Apr 15, 2026
Release: Mar 18, 2026
City of Springfield
Close: Apr 15, 2026
Work includes approx. 8,000 LF of no. 8AWG, 5kV, L-824, type C cable, installed in conduit; 7,400 LF of no. 6AWG, solid bare copper counterpoise wire, installed in trench; 4,500 LF of 1w-2" schedule 40 PVC electrical conduit, installed in trench; 3,000 LF of 2w-2" schedule 40 PVC electrical conduit, installed in trench; 110 LF of 1w-2" schedule 80 HDPE conduit, directionally bored.
City of Springfield
construction of a new single-family home.
Posted Date
Feb 18, 2026
Due Date
Apr 2, 2026
Release: Feb 18, 2026
City of Springfield
Close: Apr 2, 2026
construction of a new single-family home.
City of Springfield
The work includes the construction of approx.: 1650 CY Common Excavation; 1 LS Outlet Control Structure; 165 LF 8" Perf PVC Pipe Drain; 60 TN Random Riprap Class 3; 815 LF 18" RC Pipe Sewer; 0.6 AC Seeding; 29 LF Drainage Structure Design 4020-48"; together with numerous related items of work.
Posted Date
Apr 17, 2025
Due Date
May 16, 2025
Release: Apr 17, 2025
City of Springfield
Close: May 16, 2025
The work includes the construction of approx.: 1650 CY Common Excavation; 1 LS Outlet Control Structure; 165 LF 8" Perf PVC Pipe Drain; 60 TN Random Riprap Class 3; 815 LF 18" RC Pipe Sewer; 0.6 AC Seeding; 29 LF Drainage Structure Design 4020-48"; together with numerous related items of work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; redirect to bid.
Coops: If they’re open, briefly propose using CPV/OSP statewide contracts or Sourcewell/NASPO to streamline.
City of Springfield, MN: No evidence of sole source awards. Deprioritize this path.
Notes:
Board meetings and strategic plans from City of Springfield
This Strategic Economic Development Plan for the City of Springfield outlines the community's economic vision and long-term goals, aiming to foster a thriving community. The plan focuses on strengthening economic resilience and sustainable development through key recommendations in workforce and entrepreneurial development, housing and infrastructure improvements, and population attraction coupled with quality of life enhancements. It seeks to build a diversified economic base prepared for long-term growth.
This Safe Routes to School Plan for Springfield aims to increase the number of children safely walking or biking to school. The plan focuses on five strategic areas: education, encouragement, engineering, enforcement, and evaluation. Its vision is to cultivate a more active school-age population by fostering safe habits, developing accessible infrastructure, and creating enticing outdoor environments. Key recommendations include engineering enhancements such as curb extensions, pedestrian islands, and improved sidewalks and crosswalks, complemented by programmatic initiatives like bike rodeos, in-school safety education, and community-wide walking/biking events.
This State of the City Report for Springfield, MN reviews the challenges faced in 2025, including workforce and staffing, financial stewardship, and aging infrastructure. It outlines strategic initiatives and investments for 2026 and beyond, focusing on housing development, business development and support, facility maintenance, and technology updates. The report highlights the significant impact of state and federal grant funding in enabling and accelerating various projects, aiming to build a stronger, more vibrant community through continued dedication and strategic investment.
The City of Springfield's Strategic Economic Development Plan aims to guide the community's economic vision and long-term goals based on community input. It focuses on strengthening economic resilience and sustainable development through a comprehensive assessment of local resources and assets. The plan envisions Springfield as a thriving community with a diversified economic base, prepared for long-term growth, and capable of weathering economic stressors. Key areas of focus include workforce and entrepreneurial development, housing and infrastructure development, and population attraction and quality of life improvements.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Springfield's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database