Discover Opportunities months before the RFP drops
Learn more →Develop a comprehensive and California-aligned Community Wildfire Protection Plan (CWPP) to strengthen community resilience to wildfire, support hazard mitigation planning, guide fuel-reduction priorities, and improve coordination with regional, state, and federal partners. Recent fire events, including the Eaton Fire (2025), have highlighted the need for a modernized community wildfire strategy that addresses local fuel loads, evacuation constraints, WUI exposures, and climate-driven fire behavior. The project’s purpose is to reduce wildfire risk, improve operational readiness, enhance public safety, and ensure Sierra Madre is well positioned for state and federal funding opportunities related to wildfire mitigation.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Develop a comprehensive and California-aligned Community Wildfire Protection Plan (CWPP) to strengthen community resilience to wildfire, support hazard mitigation planning, guide fuel-reduction priorities, and improve coordination with regional, state, and federal partners. Recent fire events, including the Eaton Fire (2025), have highlighted the need for a modernized community wildfire strategy that addresses local fuel loads, evacuation constraints, WUI exposures, and climate-driven fire behavior. The project’s purpose is to reduce wildfire risk, improve operational readiness, enhance public safety, and ensure Sierra Madre is well positioned for state and federal funding opportunities related to wildfire mitigation.
AvailableProject consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 15, 2026
Release: Dec 3, 2025
Close: Jan 15, 2026
Project consists of 1,440 LF 6" PVC C900 CL 235 water main replacement, 35 LF remove & replace (in-place) existing 12" water main with 12" PVC C900 CL 235 water main, 22 LF furnish & install 12" PVC C900 CL 235 water main, 2 EA furnish & install 12" butterfly valve, 5 EA construct 6" fire hydrant assembly (excluding valve), 39 EA construct 1" water service, 2 EA abandon existing water main, see outside link.
AvailableJanitorial services at all city facilities.
Posted Date
Jun 12, 2025
Due Date
Jul 17, 2025
Release: Jun 12, 2025
Close: Jul 17, 2025
Janitorial services at all city facilities.
More RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis