Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; not a viable path here.
Coops: Lead with a cooperative contract (e.g., Sourcewell or Texas BuyBoard) to move fast and bypass a formal bid.
City of Shenandoah: No evidence of sole source awards in public records. Deprioritize this path and redirect efforts to cooperative purchasing.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Shenandoah's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Recruiter/Investigator
City Engineer
City Secretary
Chief of Police
Premium
Access the largest public sector contact database
Active opportunities open for bidding
City of Shenandoah
The City of Shenandoah is soliciting bids for the David Memorial at Tamina Intersection Improvements project to improve traffic flow and pedestrian safety by extending the right-turn lane on Tamina Road and replacing sidewalks, pedestrian ramps, storm inlets/sewer, and curb, plus traffic signal and retaining wall work. The project includes specific quantities for pavement, sidewalk, curb, a drilled shaft traffic signal pole foundation, and other related items, with an expected substantial completion within 180 calendar days. A pre-bid meeting is scheduled for 2026-01-15 at 10:00 AM (local) and bids are due 2026-01-27 at 10:00 AM CST.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
City of Shenandoah
Close: Jan 27, 2026
The City of Shenandoah is soliciting bids for the David Memorial at Tamina Intersection Improvements project to improve traffic flow and pedestrian safety by extending the right-turn lane on Tamina Road and replacing sidewalks, pedestrian ramps, storm inlets/sewer, and curb, plus traffic signal and retaining wall work. The project includes specific quantities for pavement, sidewalk, curb, a drilled shaft traffic signal pole foundation, and other related items, with an expected substantial completion within 180 calendar days. A pre-bid meeting is scheduled for 2026-01-15 at 10:00 AM (local) and bids are due 2026-01-27 at 10:00 AM CST.
AvailableCity of Shenandoah
Storm sewer extension of approximately 1,782 LF including manholes, inlets, and concrete work.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
City of Shenandoah
Close: Dec 16, 2025
Storm sewer extension of approximately 1,782 LF including manholes, inlets, and concrete work.
City of Shenandoah
Additional parking spaces, accessible parking spaces, additional sidewalks, signs, striping and storm sewer. Work consists of: 941 LF, Provide, install, maintain, move, and remove chain-line construction fence; 649 LF, Remove existing concrete curb and legally dispose of, complete in place; 380 LF, Removal of striping, complete in place; 22 SY, Remove existing gravel, complete in place; 132 SY, Provide and install 4.5" concrete sidewalk, and ADA pedestrian ramp, complete in place; 599 LS, provide and install 6" concrete curb, complete in place; 1107 SY, provide and install 6" concrete pavement, complete in place; 1219 SY, Provide and install subgrade preparation, complete in place; 82 LF, Provide and install grass-lined swale, complete in place. See attached files.
Posted Date
Jul 24, 2025
Due Date
Aug 18, 2025
Release: Jul 24, 2025
City of Shenandoah
Close: Aug 18, 2025
Additional parking spaces, accessible parking spaces, additional sidewalks, signs, striping and storm sewer. Work consists of: 941 LF, Provide, install, maintain, move, and remove chain-line construction fence; 649 LF, Remove existing concrete curb and legally dispose of, complete in place; 380 LF, Removal of striping, complete in place; 22 SY, Remove existing gravel, complete in place; 132 SY, Provide and install 4.5" concrete sidewalk, and ADA pedestrian ramp, complete in place; 599 LS, provide and install 6" concrete curb, complete in place; 1107 SY, provide and install 6" concrete pavement, complete in place; 1219 SY, Provide and install subgrade preparation, complete in place; 82 LF, Provide and install grass-lined swale, complete in place. See attached files.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.