Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Seymour
Reconstruction of O'Brien Street with curb & gutter and sidewalk on each side.
Posted Date
Jul 20, 2026
Due Date
Aug 17, 2026
Release: Jul 20, 2026
City of Seymour
Close: Aug 17, 2026
Reconstruction of O'Brien Street with curb & gutter and sidewalk on each side.
AvailableCity of Seymour
Work includes 6,980 LF silt fence; 1 LS site erosion control; 7,650 CY common excavation; 500 CY top soil; 1 LS construction entrance a (sta.2+00); 3,344 LF 15 PVC SDR 26 sanitary; 14,355 TON sanitary aggregate no 8's; 270 TON full depth backfill no 8's; 125 CY flowable backfill; 8 CY 10" concrete cap; 30 TON hma surface type b 110 lb; 167 LF 24" jack and bore w/24" steel casing pipe; 180 LF 14" IPS dr 11 HDPE; 1 EA manhole core; 10 EA sanitary manhole; 1 LS air and mandrel testing; 1 LS de watering.
Posted Date
Jul 14, 2026
Due Date
Jul 30, 2026
Release: Jul 14, 2026
City of Seymour
Close: Jul 30, 2026
Work includes 6,980 LF silt fence; 1 LS site erosion control; 7,650 CY common excavation; 500 CY top soil; 1 LS construction entrance a (sta.2+00); 3,344 LF 15 PVC SDR 26 sanitary; 14,355 TON sanitary aggregate no 8's; 270 TON full depth backfill no 8's; 125 CY flowable backfill; 8 CY 10" concrete cap; 30 TON hma surface type b 110 lb; 167 LF 24" jack and bore w/24" steel casing pipe; 180 LF 14" IPS dr 11 HDPE; 1 EA manhole core; 10 EA sanitary manhole; 1 LS air and mandrel testing; 1 LS de watering.
AvailableCity of Seymour
Work includes 6,980 LF silt fence; 1 LS site erosion control; 7,650 CY common excavation; 500 CY top soil; 1 LS construction entrance a (sta.2+00); 3,344 LF 15 PVC SDR 26 sanitary; 14,355 TON sanitary aggregate no 8's; 270 TON full depth backfill no 8's; 125 CY flowable backfill; 8 CY 10" concrete cap; 30 TON hma surface type b 110 lb; 167 LF 24" jack and bore w/24" steel casing pipe; 180 LF 14" IPS dr 11 HDPE; 1 EA manhole core; 10 EA sanitary manhole; 1 LS air and mandrel testing; 1 LS de watering.
Posted Date
Jul 14, 2026
Due Date
Jul 30, 2026
Release: Jul 14, 2026
City of Seymour
Close: Jul 30, 2026
Work includes 6,980 LF silt fence; 1 LS site erosion control; 7,650 CY common excavation; 500 CY top soil; 1 LS construction entrance a (sta.2+00); 3,344 LF 15 PVC SDR 26 sanitary; 14,355 TON sanitary aggregate no 8's; 270 TON full depth backfill no 8's; 125 CY flowable backfill; 8 CY 10" concrete cap; 30 TON hma surface type b 110 lb; 167 LF 24" jack and bore w/24" steel casing pipe; 180 LF 14" IPS dr 11 HDPE; 1 EA manhole core; 10 EA sanitary manhole; 1 LS air and mandrel testing; 1 LS de watering.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; pivot to a coop or small-buy.
Coops: Frequently procures through Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding. Buyer hasn’t historically used coops today, but you can encourage them to explore these procurement programs.
City of Seymour (IN)
Policy posture: Strict (§32.22); no documented sole-source awards in 2022–2025.
Board meetings and strategic plans from City of Seymour
This Transportation Safety Action Plan for the City of Seymour outlines actionable strategies to eliminate traffic deaths and serious injuries by 2050. The plan is structured around the Safe System Approach, addressing Safer Roads, Safer Vehicles, Safer Speeds, Safer People, and Post-Crash Care. It prioritizes interventions on the High Injury Network, implements systemic safety measures for intersections, speeds, vulnerable road users, and rural roads, and includes opportunity projects to enhance overall transportation safety and accessibility.
This document outlines the Safer Streets for Seymour transportation safety action plan, which aims to eliminate fatal and serious injury crashes in the community by 2050. The plan adopts a Safe System Approach, focusing on Safer Roads, Safer Vehicles, Safer Speeds, Safer People, and Post-Crash Care. It involves analyzing crash data, engaging with community residents and stakeholders, and developing targeted, evidence-based solutions to improve roadway safety for all users, serving as a blueprint for future safety investments.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Seymour's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge