The Land Wetland Sediment Removal and Remediation Project RFP
Posted
Sep 2, 2026
Oct 14, 2026
Sediment removal from ponds and wetland areas. Sediment removal shall be properly transported and disposed of in accordance with ADEM regulations. Installation of Erosion Control measures that include riprap, wattles, silt fence, sandbags, E-C blankets, etc. in designed areas. Construction of diversion berms and ditches. Seeding, overseeding, fertilizing and liming of areas. Selected grading of soil piles, rills, microrills and gullies. Contaminated Soil has been identified in certain areas of the project site.