Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Rogers
1.Removal of existing lift station equipment and piping at lift station no. 3. The project includes the removal of the existing precast wet well and valve vault lids and top portions. 2.Install pumps, piping, fitting, valves, and all appurtenances for the new station. 3.Furnish and install new controls and generator as noted in the contract documents. 4.Site work including the removal and installation of a new bituminous driveway, site grading, installation of new concrete pad. together with numerous related items of work, all in accordance with plans and specifications. This project is subject to prevailing wage rates, truck rentals, disadvantaged business enterprise goals, targeted group business program goals, and veteran-owned small business, equal employment opportunity provisions.
Posted Date
Jan 30, 2026
Due Date
Feb 26, 2026
Release: Jan 30, 2026
City of Rogers
Close: Feb 26, 2026
1.Removal of existing lift station equipment and piping at lift station no. 3. The project includes the removal of the existing precast wet well and valve vault lids and top portions. 2.Install pumps, piping, fitting, valves, and all appurtenances for the new station. 3.Furnish and install new controls and generator as noted in the contract documents. 4.Site work including the removal and installation of a new bituminous driveway, site grading, installation of new concrete pad. together with numerous related items of work, all in accordance with plans and specifications. This project is subject to prevailing wage rates, truck rentals, disadvantaged business enterprise goals, targeted group business program goals, and veteran-owned small business, equal employment opportunity provisions.
AvailableCity of Rogers
Project consist of approx 110,600 SY Mill Bituminous Surface; 5 EA of Remove and Replace Catch Basin; 8,700 SF Remove and Replace Concrete Sidewalk; 4,650 LF Remove and Replace Concrete Curb and Gutter; 660 TON Type SP 9.5 Wearing Course Mix 8' Path (2,B); 9,900 TON Type SP 9.5 Wearing Course Mix (3,C); 4 SYSTEM Revise Signal System
Posted Date
Oct 23, 2025
Due Date
Nov 14, 2025
Release: Oct 23, 2025
City of Rogers
Close: Nov 14, 2025
Project consist of approx 110,600 SY Mill Bituminous Surface; 5 EA of Remove and Replace Catch Basin; 8,700 SF Remove and Replace Concrete Sidewalk; 4,650 LF Remove and Replace Concrete Curb and Gutter; 660 TON Type SP 9.5 Wearing Course Mix 8' Path (2,B); 9,900 TON Type SP 9.5 Wearing Course Mix (3,C); 4 SYSTEM Revise Signal System
City of Rogers
Work includes approx 55,000 CY excavation (common/subgrade); 18,000 CY select granular embankment (CV); 10,000 ton type sp 12.5 wearing/non-wearing course mixture; 900 SF 12" - 24" RC pipe sewer design 3006; 1,200 LF 27" - 42" RC pipe sewer design 3006; etc. 1110 SF crosswalk preform thermoplastic ground in enhanced skid resistance; 202 SF pavement message preform thermoplastic ground in enhanced skid resistance; 132 LF 12" dotted line preform thermo ground in; 917 LF 24" solid line preform thermo ground in; 7231 LF 6" double solid line preform tape; 525 lf 6" broken line preform tape; 8953 LF 6" solid line preform tape; 5494 LF 4" double solid line multi-component ground in; 20 LF 8" dotted line multi-component ground in; 80 LF 6" dotted line multi-component ground in. See attached file.
Posted Date
Jul 10, 2025
Due Date
Aug 5, 2025
Release: Jul 10, 2025
City of Rogers
Close: Aug 5, 2025
Work includes approx 55,000 CY excavation (common/subgrade); 18,000 CY select granular embankment (CV); 10,000 ton type sp 12.5 wearing/non-wearing course mixture; 900 SF 12" - 24" RC pipe sewer design 3006; 1,200 LF 27" - 42" RC pipe sewer design 3006; etc. 1110 SF crosswalk preform thermoplastic ground in enhanced skid resistance; 202 SF pavement message preform thermoplastic ground in enhanced skid resistance; 132 LF 12" dotted line preform thermo ground in; 917 LF 24" solid line preform thermo ground in; 7231 LF 6" double solid line preform tape; 525 lf 6" broken line preform tape; 8953 LF 6" solid line preform tape; 5494 LF 4" double solid line multi-component ground in; 20 LF 8" dotted line multi-component ground in; 80 LF 6" dotted line multi-component ground in. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Avoid; pivot to cooperative contracting immediately.
Coops: Lead with Sourcewell for a fast, compliant purchase.
City of Rogers adheres tightly to competitive processes with no evidence of sole-sourcing for significant contracts.
Track City of Rogers's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across City of Rogers's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database