Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Perrysburg
The City of Perrysburg is soliciting construction bids to build a ten-foot-wide multi-use path along the west side of State Route 25 from the I-475 interchange to the existing multi-use path along State Route 65. The project includes paving, earthwork, aggregate base, restoration, and clearing, following the 2023 ODOT Construction and Materials Specifications with City modifications. The engineering estimate for the project is $1,020,000, with a final completion date required on or before October 15, 2026.
Posted Date
Mar 4, 2026
Due Date
Mar 26, 2026
Release: Mar 4, 2026
City of Perrysburg
Close: Mar 26, 2026
The City of Perrysburg is soliciting construction bids to build a ten-foot-wide multi-use path along the west side of State Route 25 from the I-475 interchange to the existing multi-use path along State Route 65. The project includes paving, earthwork, aggregate base, restoration, and clearing, following the 2023 ODOT Construction and Materials Specifications with City modifications. The engineering estimate for the project is $1,020,000, with a final completion date required on or before October 15, 2026.
AvailableCity of Perrysburg
Work includes paving, earthwork, aggregate base, restoration, and clearing, excavation, 423 SF of 4" concrete walk, 411 CY of rock channel protection, type c with filter, 8,408 SY of seeding and mulching, 17 EA of manhole adjusted, 3 EA of 6" fire hydrant.
Posted Date
Mar 4, 2026
Due Date
Mar 26, 2026
Release: Mar 4, 2026
City of Perrysburg
Close: Mar 26, 2026
Work includes paving, earthwork, aggregate base, restoration, and clearing, excavation, 423 SF of 4" concrete walk, 411 CY of rock channel protection, type c with filter, 8,408 SY of seeding and mulching, 17 EA of manhole adjusted, 3 EA of 6" fire hydrant.
AvailableCity of Perrysburg
Project consists of renovating the kitchen and dayroom portion of fire station.
Posted Date
Mar 4, 2026
Due Date
Apr 2, 2026
Release: Mar 4, 2026
City of Perrysburg
Close: Apr 2, 2026
Project consists of renovating the kitchen and dayroom portion of fire station.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from City of Perrysburg Engineering Division
The City Council held a public hearing regarding a rezoning request for 940 Westbrook Drive to transfer it to RM zoning, which is multi-family residential. This property, along with 950 Westbrook Drive, currently contains multi-family apartment units. The request is to re-zone the property back to multi-family to match the current use. The council also discussed a similar request for 950 Westbrook Drive, which was also part of the 2007 rezoning and is intended to revert back to multi-family zoning. Additionally, they discussed a rezoning application for 941 Westbrook Drive, which has a multi-unit building on it and is currently a legal non-conforming property.
The committee discussed approving meeting minutes from November 23rd. They reviewed a proposed job description for a staff engineer and an HR coordinator, including the scope of the engineering department. They also discussed the restructuring of the law department and a request to look into passing legislation that all non-bargaining employees raises are reported to the personnel committee on an annual basis.
The committee discussed updates to the land use plan, focusing on the Perrysburg Heights area. A color-coded map was presented to address concerns from residents while aiming to establish a commercial corridor along State Route 25. The proposal included maintaining some access points, disconnecting others, and creating a collector road to avoid main road traffic. The location of a north-south blue road was strategically positioned based on existing corporate boundaries.
Discussion regarding a potential nominee, Matt Sutter, to the board of zoning appeals. A motion was made to adjourn to executive session to consider the appointment of a public official.
The meeting of the Perrysburg Service Committee included discussions on citizen concerns, approval of prior months' minutes, and the fall street and subdivision contract for tree planting. The committee discussed planting 211 trees, with the majority paid for by planters of new developments and some as replacement trees. Quotes for the trees were reviewed, with North Branch Nursery providing the most competitive price. The committee also discussed identifying trees for removal due to disease or safety concerns, and the possibility of creating an arborist position within the Public Service Department. Additional discussions covered the budget, including repairs and maintenance, pond erosion control, and the potential for a kayak launch at the park. The committee also reviewed the street division budget, including salary increases and equipment rentals.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Perrysburg Engineering Division's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database