Discover Opportunities months before the RFP drops
Learn more →City of Oak Ridge solicits bids for construction of the Scarboro 85 monument at A.K. Bissell Park. Work includes complete monument construction and site work per plans/specs (mobilization, erosion control, seeding, earthwork, cast-in-place concrete, rammed earth walls or approved equivalents, landscaping, site furnishings, electrical/lighting, installation of content/exhibits, and a maintenance plan). Procurement requires a Tennessee contractor license, 10% bid guarantee, 100% performance and labor & material bonds, specified insurance, 5% retainage, liquidated damages ($500/day), and completion within 270 calendar days from Notice to Proceed.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Close: Dec 9, 2025
City of Oak Ridge solicits bids for construction of the Scarboro 85 monument at A.K. Bissell Park. Work includes complete monument construction and site work per plans/specs (mobilization, erosion control, seeding, earthwork, cast-in-place concrete, rammed earth walls or approved equivalents, landscaping, site furnishings, electrical/lighting, installation of content/exhibits, and a maintenance plan). Procurement requires a Tennessee contractor license, 10% bid guarantee, 100% performance and labor & material bonds, specified insurance, 5% retainage, liquidated damages ($500/day), and completion within 270 calendar days from Notice to Proceed.
Provide an integrated library system and/or online public access catalog or discovery layer, successfully migrate all data from the library's current system, train staff on the configuration and daily use of the system, and provide ongoing support and training.
Posted Date
Nov 4, 2025
Due Date
Jan 6, 2026
Release: Nov 4, 2025
Close: Jan 6, 2026
Provide an integrated library system and/or online public access catalog or discovery layer, successfully migrate all data from the library's current system, train staff on the configuration and daily use of the system, and provide ongoing support and training.
AvailableWork includes construction of a monument. Erosion control; seeding; site work / earth moving; cast-in place concrete; rammed earth walls; landscaping; site furnishings; electrical & lighting. Cast-in-place architectural concrete: formed concrete that is exposed to view on surfaces of completed structure or building and that requires special concrete materials, formwork, placement, or finishes to obtain specified landscape architectural appearance. Cementitious materials: portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blastfurnace slag, and silica fume; subject to compliance with requirements. See outside link.
Posted Date
Sep 29, 2025
Due Date
Dec 9, 2025
Release: Sep 29, 2025
Close: Dec 9, 2025
Work includes construction of a monument. Erosion control; seeding; site work / earth moving; cast-in place concrete; rammed earth walls; landscaping; site furnishings; electrical & lighting. Cast-in-place architectural concrete: formed concrete that is exposed to view on surfaces of completed structure or building and that requires special concrete materials, formwork, placement, or finishes to obtain specified landscape architectural appearance. Cementitious materials: portland cement alone or in combination with one or more of the following: blended hydraulic cement, fly ash and other pozzolans, ground granulated blastfurnace slag, and silica fume; subject to compliance with requirements. See outside link.
More RFPs available with Premium →
Premium
Access the largest public sector contact database
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Get complete source documentation & analysis