Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Mount Vernon
Sanitary sewer project includes all labor, materials, and equipment necessary to construct 12" truss pipe sanitary sewer, sanitary sewer services, manholes, field tile, earthwork, excavation, backfill, sitework, erosion control, seeding and miscellaneous associated work including cleanup.
Posted Date
May 8, 2026
Due Date
May 28, 2026
Release: May 8, 2026
City of Mount Vernon
Close: May 28, 2026
Sanitary sewer project includes all labor, materials, and equipment necessary to construct 12" truss pipe sanitary sewer, sanitary sewer services, manholes, field tile, earthwork, excavation, backfill, sitework, erosion control, seeding and miscellaneous associated work including cleanup.
AvailableCity of Mount Vernon
Work includes removal and replacement of 11,876 SF of 4" PCC sidewalk, 8,609 SF of 6" PCC sidewalk, 23 ADA Ramps, sidewalk grinding, excavation, grading, seeding, traffic control and miscellaneous associated work including cleanup.
Posted Date
Jun 25, 2025
Due Date
Jul 17, 2025
Release: Jun 25, 2025
City of Mount Vernon
Close: Jul 17, 2025
Work includes removal and replacement of 11,876 SF of 4" PCC sidewalk, 8,609 SF of 6" PCC sidewalk, 23 ADA Ramps, sidewalk grinding, excavation, grading, seeding, traffic control and miscellaneous associated work including cleanup.
City of Mount Vernon
Construct 3,813 SY of 8" PCC pavement on a 4,619 SY of 6" modified subbase; 886 LF of 4.5' x 7" PCC curb and gutter; 1,239 LF subdrain; 8 Ea intakes; 838 LF of 15" - 24" storm sewer; 335 SY PCC driveways; 109 SY of 6" PCC sidewalk; 1,295 LF of 8" water main in open cut; 180 LF of 18" casing pipe augured in place with 8" water main; traffic signals, traffic control; pavement markings, signs, earthwork, excavation, backfill, sitework; erosion control, seeding and miscellaneous associated work including cleanup.
Posted Date
Jun 11, 2025
Due Date
Jun 26, 2025
Release: Jun 11, 2025
City of Mount Vernon
Close: Jun 26, 2025
Construct 3,813 SY of 8" PCC pavement on a 4,619 SY of 6" modified subbase; 886 LF of 4.5' x 7" PCC curb and gutter; 1,239 LF subdrain; 8 Ea intakes; 838 LF of 15" - 24" storm sewer; 335 SY PCC driveways; 109 SY of 6" PCC sidewalk; 1,295 LF of 8" water main in open cut; 180 LF of 18" casing pipe augured in place with 8" water main; traffic signals, traffic control; pavement markings, signs, earthwork, excavation, backfill, sitework; erosion control, seeding and miscellaneous associated work including cleanup.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; steer to coops instead of a formal bid.
Coops: Ask to purchase via Sourcewell or the State of Iowa cooperative.
City of Mount Vernon (IA) shows no evidence of sole source awards and adheres to competitive bidding.
Board meetings and strategic plans from City of Mount Vernon
The commission discussed the maintenance of cemetery records, including the completion of a documents project and the purchase of a laptop for commission use. Plans were discussed for John Heider's visit, focusing on restoration and preservation efforts, and the need for assistance during the educational and hands-on sessions. The commission agreed that the mowing and trimming of the cemetery grounds were satisfactory and considered the addition of metal arches over the driveway entrances. They also discussed promoting the cemetery through various channels and a collaboration opportunity with SAPIC and SHSI for the nation's 250th birthday celebration.
The meeting involved a discussion and consideration of approving the final plat for Stonebrook 9th Addition to the City of Mount Vernon. City staff recommended against approval at the time due to the subdivision ordinance requiring substantial completion of improvements before accepting the final plat, which had not yet occurred.
The commission discussed and took action on several site plans, including the Mount Vernon Dental Site Plan and the Mount Vernon-Lisbon Police Station Site Plan. Additionally, there was a discussion regarding possible amendments to the code of ordinances to promote the use of accessory dwelling units, with a decision to seek input from an outside agency such as ECICOG.
The meeting involved a public hearing, discussion, and consideration of an application for conditional use for the installation of a ground-mounted solar system at 302 Hwy 1 South. The board discussed zoning requirements, potential options for ground installation, and conditional approval subject to compliance with existing zoning regulations, including setback requirements and landscape screening elements based on US Hwy 30 Overlay design standards.
The Cemetery Commission meeting addressed concerns raised by a guest regarding leash laws for dogs, the need for a trash can, police surveillance for drug deals, and the removal of a damaged bench. The Mount Vernon Masonic Lodge #112 approved funds for the repair of grave markers. There was also discussion of establishing cemetery policies and regulations, which was tabled. Goals pertaining to records and documents maintenance, monument and headstone restoration, grounds maintenance and landscaping, and promoting and publicizing the cemetery were discussed. Other topics included a report on cemetery information entered into an Excel database, the removal of a fence and flagged trees, and organizing the cemetery garage for artifact storage.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Mount Vernon's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge