Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Merriam
The City of Merriam is soliciting sealed proposals for the "2026 Drainage Improvements (Switzer Meadows)", a stormwater/drainage project that includes cured-in-place pipe (CIPP) lining, pipe replacement, inlet modification, storm structure replacement, and pavement reconstruction in the Switzer Meadows area. Sealed bids are due at Merriam City Hall (9001 W. 62nd St., Merriam, KS) on August 4, 2026 at 1:00 PM local time; bids will be publicly opened and a 5% bid bond is required and proposals must be submitted on the printed proposal form included in a bound Project Manual. The Project Manual and full bidding documents are distributed by Drexel Technologies (available for purchase or via Drexel's electronic plan room); no direct buyer-hosted PDF/Docx solicitation file was posted on the City's listing that could be downloaded without using Drexel's distribution channel.
Posted Date
Jul 15, 2026
Due Date
Aug 4, 2026
Release: Jul 15, 2026
City of Merriam
Close: Aug 4, 2026
The City of Merriam is soliciting sealed proposals for the "2026 Drainage Improvements (Switzer Meadows)", a stormwater/drainage project that includes cured-in-place pipe (CIPP) lining, pipe replacement, inlet modification, storm structure replacement, and pavement reconstruction in the Switzer Meadows area. Sealed bids are due at Merriam City Hall (9001 W. 62nd St., Merriam, KS) on August 4, 2026 at 1:00 PM local time; bids will be publicly opened and a 5% bid bond is required and proposals must be submitted on the printed proposal form included in a bound Project Manual. The Project Manual and full bidding documents are distributed by Drexel Technologies (available for purchase or via Drexel's electronic plan room); no direct buyer-hosted PDF/Docx solicitation file was posted on the City's listing that could be downloaded without using Drexel's distribution channel.
AvailableCity of Merriam
The City of Merriam, Kansas is seeking a licensed, qualified contractor to provide and install two emergency back-up diesel generators for Merriam City Hall and the Merriam Police Department. The scope includes removal of existing generators, furnishing and installing new diesel generators, replacement/modification of automatic transfer switches, and integration with existing electrical infrastructure. The project also encompasses installation of concrete pads and structural supports, coordination with utility providers, system startup, load bank testing, commissioning, and operator training.
Posted Date
Jun 2, 2026
Due Date
Jun 12, 2026
Release: Jun 2, 2026
City of Merriam
Close: Jun 12, 2026
The City of Merriam, Kansas is seeking a licensed, qualified contractor to provide and install two emergency back-up diesel generators for Merriam City Hall and the Merriam Police Department. The scope includes removal of existing generators, furnishing and installing new diesel generators, replacement/modification of automatic transfer switches, and integration with existing electrical infrastructure. The project also encompasses installation of concrete pads and structural supports, coordination with utility providers, system startup, load bank testing, commissioning, and operator training.
City of Merriam
Design, fabrication, and installation of an interactive artistic sculpture.
Posted Date
Mar 30, 2026
Due Date
Jun 6, 2026
Release: Mar 30, 2026
City of Merriam
Close: Jun 6, 2026
Design, fabrication, and installation of an interactive artistic sculpture.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Avoid; pivot to coops immediately.
Coops: Frequently procures through Sourcewell, OMNIA Partners, and Kansas Department of Administration statewide contracts; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Merriam, KS rarely uses sole source; no documented direct awards noted in the provided sources. No specific sole source dollar thresholds were identified.
Board meetings and strategic plans from City of Merriam
The meeting addressed a variety of administrative and developmental items, including the approval of various easements, service agreements, and vendor payments. A public hearing was held regarding the establishment of a Community Improvement District for the Merriam Town Center, leading to the approval of a development agreement and associated Industrial Revenue Bonds to support center upgrades and the addition of a new grocery store. The council further authorized the creation of new financial funds for economic development and CID management, and approved the intent to exceed the Revenue Neutral Rate for budget purposes. Additional updates were provided regarding capital improvement projects, financial performance, and urban planning initiatives.
The committee discussed the scoring process for the 2026 RFQ, setting parameters for submission evaluation and establishing a timeline for review. The project schedule was updated with the rescheduling of upcoming committee meetings to align with the review process. The committee also considered potential post-selection strategies, including the use of 360-degree video for artists and the development of interview questions. Other topics included an update on a city hall window project, future bus stop opportunities, and concerns regarding the placement and consultation process for permanent public art installations.
The committee meeting consisted of a tour of various parks and civic developments to review project history, development goals, and public usage strategies. Key discussion topics included the history and amenities of Sar-Ko-Par Trails Park in Lenexa, the economic development impact and community-focused design of the Lenexa City Center, and the phased development and public-private partnership structure of Meadowbrook Park.
The Commission conducted the election of officers for 2026. Key business discussions involved a traffic study overview of the I-35 and Shawnee Mission Parkway interchange, including concerns about pedestrian safety and accessibility within the proposed Diverging Diamond Interchange. The meeting also addressed various city projects, including downtown master planning, property acquisitions along Merriam Drive, ongoing construction at the Trader Joe's site, the Serrano Apartments development, remediation activities at a former 7-Eleven site, and upcoming public parking expansions.
The meeting involved a tour of Downtown Lee's Summit, focusing on long-term development strategies including the construction of a market pavilion, design standards, and streetscape improvements. Discussions also included the rescheduling of the August agenda and an update regarding two committee member resignations, resulting in a return to the original nine-member committee size.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Merriam's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge