Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Marriott-Slaterville
Work includes 1 LS of mobilization; 1,850 LF of remove irrigation pipe; 1 EA of remove irrigation structure; 1 LS of excavation and grading (approx 13,000 CY cut to subgrade); 600 LF of saw cut asphalt; 5,050 SFvof remove concrete flatwork; 660 LF of remove curb and gutter; 26 EA of remove existing mailbox; 1,000 LF of remove existing fence; 18 EA of remove abandoned power poles; 3 EA of plug storm drain pipe; 2,297 LF of new storm drain 15" rcp; 1,406 LF of new storm drain 18" rcp; 5 EA of new storm drain 4' manhole; 3 EA of new storm drai 5' manhole; etc, see attached file.
Posted Date
Apr 10, 2026
Due Date
Apr 28, 2026
Release: Apr 10, 2026
City of Marriott-Slaterville
Close: Apr 28, 2026
Work includes 1 LS of mobilization; 1,850 LF of remove irrigation pipe; 1 EA of remove irrigation structure; 1 LS of excavation and grading (approx 13,000 CY cut to subgrade); 600 LF of saw cut asphalt; 5,050 SFvof remove concrete flatwork; 660 LF of remove curb and gutter; 26 EA of remove existing mailbox; 1,000 LF of remove existing fence; 18 EA of remove abandoned power poles; 3 EA of plug storm drain pipe; 2,297 LF of new storm drain 15" rcp; 1,406 LF of new storm drain 18" rcp; 5 EA of new storm drain 4' manhole; 3 EA of new storm drai 5' manhole; etc, see attached file.
AvailableCity of Marriott-Slaterville
Project consists of constructing a new parking lot and walking trail, including storm drain infrastructure.
Posted Date
-
Due Date
Mar 31, 2026
City of Marriott-Slaterville
Close: Mar 31, 2026
Project consists of constructing a new parking lot and walking trail, including storm drain infrastructure.
City of Marriott-Slaterville
Work includes approx 3,250 LF of 10" sewer pipe; 18 EA 4' sewer manhole; 1 EA connection of new sewer pipe to existing manhole; 3,660 LF of saw cut asphalt. See outside link.
Posted Date
May 14, 2025
Due Date
Jun 17, 2025
Release: May 14, 2025
City of Marriott-Slaterville
Close: Jun 17, 2025
Work includes approx 3,250 LF of 10" sewer pipe; 18 EA 4' sewer manhole; 1 EA connection of new sewer pipe to existing manhole; 3,660 LF of saw cut asphalt. See outside link.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Sole Source: Deprioritize; steer the purchase to a cooperative path instead.
Coops: Lead with OMNIA Partners or Sourcewell. Confirm piggyback eligibility with the City Administrator or Finance.
City of Marriott-Slaterville has no publicly posted sole source policy or dollar thresholds.
Track City of Marriott-Slaterville's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database