Discover Opportunities months before the RFP drops
Learn more →Requesting proposals from qualified contractors for furnishing all necessary materials, machinery, tools, equipment, labor, and supervision for the Lift Station No. 1 and Force Main Replacement.
Posted Date
-
Due Date
Jan 21, 2025
Close: Jan 21, 2025
Requesting proposals from qualified contractors for furnishing all necessary materials, machinery, tools, equipment, labor, and supervision for the Lift Station No. 1 and Force Main Replacement.
Construction Manager at Risk (CMAR) Services for Public Safety Facilities Projects.
Posted Date
Dec 6, 2025
Due Date
Jan 5, 2026
Release: Dec 6, 2025
Close: Jan 5, 2026
Construction Manager at Risk (CMAR) Services for Public Safety Facilities Projects.
AvailableWork includes Bypass setup for 3" pump, Well point dewatering system setup, 1 LF of Well point dewatering system, up to 10 LF deep; Furnish and install new manhole frame and cover and adjustment (±1 vertical foot), 1 LF of Removal of concrete sidewalk (4 LF wide of equivalent LF area), including reinforcement, Remove and replace 30" sewer, > 10 to 20 LF deep, 701 LF & up, Reconnection (open cut) of 6" short-side single sanitary sewer service lines, includes up to 5 LF of sewer lateral beyond right-of-way and 4" cleanout, Point repair, up to 36" diameter, up to 5 LF deep, up to 6 LF length, Replace 8" sewer using pipe bursting (8" to 8"), 351 LF to 700 LF. See attached file.
Posted Date
Dec 6, 2025
Due Date
Jan 20, 2026
Release: Dec 6, 2025
Close: Jan 20, 2026
Work includes Bypass setup for 3" pump, Well point dewatering system setup, 1 LF of Well point dewatering system, up to 10 LF deep; Furnish and install new manhole frame and cover and adjustment (±1 vertical foot), 1 LF of Removal of concrete sidewalk (4 LF wide of equivalent LF area), including reinforcement, Remove and replace 30" sewer, > 10 to 20 LF deep, 701 LF & up, Reconnection (open cut) of 6" short-side single sanitary sewer service lines, includes up to 5 LF of sewer lateral beyond right-of-way and 4" cleanout, Point repair, up to 36" diameter, up to 5 LF deep, up to 6 LF length, Replace 8" sewer using pipe bursting (8" to 8"), 351 LF to 700 LF. See attached file.
AvailableMore RFPs available with Premium →
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis