Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Bypass setup for 3" pump, Well point dewatering system setup, 1 LF of Well point dewatering system, up to 10 LF deep; Furnish and install new manhole frame and cover and adjustment (±1 vertical foot), 1 LF of Removal of concrete sidewalk (4 LF wide of equivalent LF area), including reinforcement, Remove and replace 30" sewer, > 10 to 20 LF deep, 701 LF & up, Reconnection (open cut) of 6" short-side single sanitary sewer service lines, includes up to 5 LF of sewer lateral beyond right-of-way and 4" cleanout, Point repair, up to 36" diameter, up to 5 LF deep, up to 6 LF length, Replace 8" sewer using pipe bursting (8" to 8"), 351 LF to 700 LF. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Project generally includes, but is not limited to cured-in-place pipe lining of approx. 3,700 LF of 8" sanitary sewer main, 53 lateral reinstatements, the rehabilitation of 6 sanitary sewer manholes, Alternate No. 1 which includes the cured-in-place pipe lining of approx. 1,350 LF of 8" sanitary sewer main, 20 lateral reinstatements, and associated work, and Alternate No. 2 which includes the manhole rehabilitation of 10 sanitary sewer manholes, and all associated materials, equipment, labor, and necessary apparatuses as contemplated by the Contract Documents.
Premium
Access the largest public sector contact database
The City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Posted Date
-
Due Date
Dec 12, 2025
Release: -
Close: Dec 12, 2025
The City of Grove City, Ohio is soliciting sealed bids for its 2025 Sanitary Sewer Rehabilitation project, which includes rehabilitating approximately 2,312 LF of 8‑inch, 492 LF of 15‑inch, and 1,728 LF of 18‑inch sanitary sewer with CIPP liners, along with short liners, chemical grouting, manhole repairs, and point repairs. Bids are due by 11:00 a.m. local time on December 12, 2025 (04:00 PM UTC).
Work includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Work includes approx. 7,394 LF of 8" Preparatory Sewer Cleaning and Pre-Lining Televising; 230 LF of 10" Preparatory Sewer Cleaning and Pre-Lining Televising; 2 EA of Sanitary Sewer Manhole Grouting; 2 EA of Sanitary Sewer Manhole Lining; 4 EA of Sanitary Lateral Grouting; 5 EA of Repair Protruding Tap Without Excavation. See outside link.
AvailableThe proposed construction consists of 532 LF of sanitary sewer replacement, sanitary sewer lining of approx 6,030 LF of pipe ranging in size from 12" to 21" diameter, sanitary sewer manhole rehabilitation, including 3 cover replacements, 5 manhole replacements, 18 internal chimney seals, and other miscellaneous items of work.
Posted Date
Nov 25, 2025
Due Date
Dec 19, 2025
Release: Nov 25, 2025
Close: Dec 19, 2025
The proposed construction consists of 532 LF of sanitary sewer replacement, sanitary sewer lining of approx 6,030 LF of pipe ranging in size from 12" to 21" diameter, sanitary sewer manhole rehabilitation, including 3 cover replacements, 5 manhole replacements, 18 internal chimney seals, and other miscellaneous items of work.