Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Huntington
The City of Huntington, Indiana is soliciting bids for the construction of a duplex submersible lift station north of Progress Drive in the River Fork West Industrial Park, with a force main discharging to the existing gravity sewer on CR 200N. The work includes clearing right-of-way, rock excavation, a lift station wet well and valve vault, ductile iron piping and valves, a pump control panel, switchgear, site lighting, fencing, approximately 2,300 feet of 6-inch HDPE force main, horizontal directional drilling under roadways, asphalt paving of an existing stone cul-de-sac, erosion control, and surface restoration. A mandatory pre-bid meeting is scheduled for July 8, 2026 at 9:30 a.m., bids are due by July 20, 2026 at 3:30 p.m. local time at the Huntington city offices, and the Board of Public Works and Safety anticipates awarding the contract on August 3, 2026.
Posted Date
Jun 24, 2026
Due Date
Jul 20, 2026
Release: Jun 24, 2026
City of Huntington
Close: Jul 20, 2026
The City of Huntington, Indiana is soliciting bids for the construction of a duplex submersible lift station north of Progress Drive in the River Fork West Industrial Park, with a force main discharging to the existing gravity sewer on CR 200N. The work includes clearing right-of-way, rock excavation, a lift station wet well and valve vault, ductile iron piping and valves, a pump control panel, switchgear, site lighting, fencing, approximately 2,300 feet of 6-inch HDPE force main, horizontal directional drilling under roadways, asphalt paving of an existing stone cul-de-sac, erosion control, and surface restoration. A mandatory pre-bid meeting is scheduled for July 8, 2026 at 9:30 a.m., bids are due by July 20, 2026 at 3:30 p.m. local time at the Huntington city offices, and the Board of Public Works and Safety anticipates awarding the contract on August 3, 2026.
AvailableCity of Huntington
Provide demolition of the building without removal of the acms (asphalt roofing materials, cementitious wall and ceiling panels) or pre-demolition cleanup of asbestos-laden dust. The site consists of adjoining structures with multiple construction dates, totaling approximately 80,000 SF. The project will require significant dust suppression techniques to eliminate any visible dust emissions during demolition activities as the safety of surrounding residents and residential properties is critical.
Posted Date
Jun 11, 2025
Due Date
Jul 7, 2025
Release: Jun 11, 2025
City of Huntington
Close: Jul 7, 2025
Provide demolition of the building without removal of the acms (asphalt roofing materials, cementitious wall and ceiling panels) or pre-demolition cleanup of asbestos-laden dust. The site consists of adjoining structures with multiple construction dates, totaling approximately 80,000 SF. The project will require significant dust suppression techniques to eliminate any visible dust emissions during demolition activities as the safety of surrounding residents and residential properties is critical.
City of Huntington
Provision of construction manager as constructor for the city building renovations project.
Posted Date
Apr 9, 2025
Due Date
Apr 23, 2025
Release: Apr 9, 2025
City of Huntington
Close: Apr 23, 2025
Provision of construction manager as constructor for the city building renovations project.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not supported here—deprioritize and return to a competitive bid.
Coops: If the buyer is open to a coop, ask about using Sourcewell; if not, suggest exploring OneIndiana, HGACBuy, NASPO ValuePoint, or OMNIA Partners.
City of Huntington: There is no evidence of sole source contracting in public records.
Board meetings and strategic plans from City of Huntington
The board meeting covered several key items. The Humane Society presented their 2024 annual report, highlighting animal intake, adoptions, and the Prevent a Litter program's impact on reducing animal control calls and impounds. Contracts were discussed and approved for fire alarm monitoring and police department canine services. Enforcement actions were addressed for two properties: 18 White Street, where an order of enforcement was affirmed and demolition proposals will be sought, and 245 Riverside Drive, where the order of enforcement was affirmed and demolition proposals will also be sought. A $2500 fine was assessed for failure to comply with the order for 18 White Street.
The council meeting started with an invocation and the Pledge of Allegiance. The minutes from the previous meeting were approved. Reports from committees and commissions were heard, including an update on the Dora Riverfront project and its planned events. A citizen petition was presented regarding the city's naturalized landscape ordinance and its 400-foot notification requirement. A significant portion of the meeting was dedicated to a discussion of a draft ordinance to authorize the use of golf carts and utility task vehicles on city streets. Council members raised concerns about traffic safety and the potential for golf carts to impede traffic flow. Specific details of the ordinance were reviewed, including safety requirements, speed limits, crossing restrictions, and age limits for drivers. The council members expressed appreciation for the work done on the draft ordinance and planned to further review it at a later meeting.
The council meeting included a public hearing and additional appropriation for the fire department. Discussion included reports from committees, boards, and commissions. New business items included the first reading of ordinance 21-C24, providing additional funding for the fire department's overtime and building structure line items, and ordinance 22-C24, amending the salary ordinance to clarify and update certain positions and salaries. The council also discussed project ideas from the youth council, including the installation of a got pit and nine square course and support for Miriam's Closet.
The council meeting included an invocation and Pledge of Allegiance. A public hearing was held for additional appropriations from the Park fund and ARPA funds. Reports were given from committees, boards, and commissions, including a year-end report highlighting significant economic development activity, with an average hourly wage of $27 for new jobs created. An update on American Rescue Plan dollars allocated to the city was presented, detailing expenditures and planned uses for remaining funds. Discussion included downtown improvements, police radio upgrades, sidewalk improvements, utility projects, and tree canopy improvements. A contract with the city's Redevelopment Commission was approved to obligate remaining ARPA funds.
The board meeting covered several key topics. Bids for the Little River Bank stabilization project were opened and taken under advisement. Bids for the sale of a 2013 Rosenbauer fire truck were also opened and a bid of $13,000 from Command Fire was accepted. 2025 employment agreements, reflecting a 5% salary increase, were approved. A new block party application was presented for informational purposes. Accounts payable were authorized for payment.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Huntington's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge