Water System Improvements RFP
Aug 19, 2026
Closes
Sep 23, 2026
Project consists of modifying the existing water distribution system by capping the existing waterline that currently bypasses the storage tank, as well as adding valving and a min new water line after the storage tank to provide service to the woods at hermitage. The work includes the installation of 6" PVC water main, two gate valves, and all necessary fittings, appurtenances, and connections required to integrate the new infrastructure with the existing water system.