Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Hartford
Work includes approx 7174 CY unclassified excavation; 130 LF of 18" RCP class 3; 215 LF of 6" corrugated polyethylene drainage tubing; 315 LF of 12" C900 DR 18 PVC water main; 2 EA 2" water service reconnect.
Posted Date
-
Due Date
Aug 13, 2026
City of Hartford
Close: Aug 13, 2026
Work includes approx 7174 CY unclassified excavation; 130 LF of 18" RCP class 3; 215 LF of 6" corrugated polyethylene drainage tubing; 315 LF of 12" C900 DR 18 PVC water main; 2 EA 2" water service reconnect.
AvailableCity of Hartford
Culvert installation, aggregate surfacing, and restoration to construct granular parking areas and drive aisles. Work includes mobilization 1 LS; unclassified excavation 3822 CY; water for vegetation 775 MGAL; scarify and recompact subgrade 9806 SY; remove and replace topsoil 1 LS: reclaimed asphalt surfacing, install 2814 ton; gravel surfacing 100 ton; 12" storm sewer, furnish 317 LF; 12" storm sewer, install 317 LF; 18" storm sewer, furnish 109 LF; 18" storm sewer, install 109 LF; 12" flared end, furnish 6 EA; 12" flared end, install 6 EA; 18" flared end, furnish 2 EA; 18" flared end, install 2 EA; 2.0' x 2.0" perforated tube post 36 LF; type 4 object marker 4 EA. See attached file.
Posted Date
Jul 8, 2025
Due Date
Jul 24, 2025
Release: Jul 8, 2025
City of Hartford
Close: Jul 24, 2025
Culvert installation, aggregate surfacing, and restoration to construct granular parking areas and drive aisles. Work includes mobilization 1 LS; unclassified excavation 3822 CY; water for vegetation 775 MGAL; scarify and recompact subgrade 9806 SY; remove and replace topsoil 1 LS: reclaimed asphalt surfacing, install 2814 ton; gravel surfacing 100 ton; 12" storm sewer, furnish 317 LF; 12" storm sewer, install 317 LF; 18" storm sewer, furnish 109 LF; 18" storm sewer, install 109 LF; 12" flared end, furnish 6 EA; 12" flared end, install 6 EA; 18" flared end, furnish 2 EA; 18" flared end, install 2 EA; 2.0' x 2.0" perforated tube post 36 LF; type 4 object marker 4 EA. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $50,000, use sole source; deprioritize—no evidence this path is used; steer to coops.
Coops: Frequently procures through Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Hartford (SD): No evidence of sole source contracting. Deprioritize this path and redirect to cooperative purchasing.
Board meetings and strategic plans from City of Hartford
The meeting included discussions and updates on Swenson Park, covering topics such as the concession stand, maintenance fees for field usage, and advertising agreements. Updates were provided on the 2025 budget items, including progress on the parking lot, concrete work, bleachers, shade structures, and playset placement at Swenson Park, as well as the restroom construction at Lyons Park. The board reviewed and updated the 1-5 year Capital Improvement Plan, considering the park master plan from ISG for future planning. Other topics included updates from council and staff members, and a review of agenda items for the next meeting.
The council discussed and approved a special event permit for the 2025 Hometown Christmas event, including road closures and the use of city resources. They also approved a cannabis dispensary license for Unity Road, LLC. The Engineer reported on the WRRF project, Western Ave project, city-wide water model project, and the Mickelson Rd shared use path. Concerns were raised about drainage issues affecting farmland. Reports were given by the Fire Department, Code Enforcement, Public Works, Finance Officer, and City Administrator. The council reviewed a proposed advertising plan for economic development funds. A funding request from the Hartford Area Development Foundation was discussed but ultimately failed. Keith Carlson was appointed to the open seat in Ward 1.
The Hartford Park and Recreation Board meeting included discussions on the concession stand and maintenance fees for Swenson Park, as well as business advertising via signage. Updates were provided on the Swenson Park parking lot, concrete work, bleachers, shade structures, and playset placement. The new restroom building in Lyons Park has been started. The City Council approved the 2026 requested budget, assigning funds for Park and Recreation Capital Improvements. The board members were asked to review the park master plan from ISG for future planning.
The Planning and Zoning meeting included discussions and actions on several conditional use applications, including one for multifamily units in Windsor Addition and another for a detached garage on N Main Ave. The board also reviewed and discussed a project plan submitted by Windsor Group LLC for the creation of Tax Increment Finance District #3, and recommended its creation to the city council. Additionally, the board discussed rescheduling the November 11, 2025 meeting due to the Veterans Day holiday. Updates were provided on various projects including the Western Ave Expansion, WRRF, Swenson Parking Lot, TA Grant, Kelly Ave Drainage Study, and a city-wide water model.
The council discussed issues related to water drainage from the Swenson Addition affecting farmland and agreed to add it to a future agenda. They approved liquor license renewals for 2026 and a special assessment for the 12th St/Oaks Ave Street Project, addressing concerns from the HADF regarding their portion of the assessments. Additionally, they approved the creation of Tax Increment Finance District #3 for a development project at Hwy 38/Colton Rd. Reports were heard from the Sheriff's Department, City Engineer, Public Works Superintendent, Finance Officer, and City Administrator, covering topics such as traffic on 12th St, progress on the WRRF and Western Ave projects, winter preparations, lagoon samples, park maintenance, and updates on the Nielson Development. The council also approved a billboard lease renewal and entered an executive session for legal and economic development matters.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Hartford's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge