Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Garland
The project includes the following work: Roadway excavation and removal of existing deteriorating asphalt, Roadway reconstruction of approximately 350 ft, Replacement of 2 storm drain catch basins, Replacement of 3 water service laterals.
Posted Date
Jul 1, 2026
Due Date
Jul 15, 2026
Release: Jul 1, 2026
City of Garland
Close: Jul 15, 2026
The project includes the following work: Roadway excavation and removal of existing deteriorating asphalt, Roadway reconstruction of approximately 350 ft, Replacement of 2 storm drain catch basins, Replacement of 3 water service laterals.
AvailableCity of Garland
Provide installation of 1,060 LF of 4' sidewalk, curb and gutter, an ADA ramp, and other items commonly associated with sidewalk projects. 1 LS mobilization; 1 LS traffic control; 1 LS storm water pollution prevention plan (swppp); 1 EA relocate water meter; 120 SY removal and disposal of asphalt surfacing; 600 TN furnish and install clean import granular fill material for embankment, clear and grub as necessary for installation; 24 LF furnish & install 8" PVC stormwater pipe; 25 CF furnish and install riprap; 10 TN furnish and install clean import material for trench backfill; 10 tn furnish & install 1" clean gravel pipe bedding; 5 TN furnish and install crushed pit run to replace pumping soil; 25 SY furnish and install geosynthetic fabric mirafi 600 x or equivalent. See attached file.
Posted Date
Jul 15, 2025
Due Date
Jul 31, 2025
Release: Jul 15, 2025
City of Garland
Close: Jul 31, 2025
Provide installation of 1,060 LF of 4' sidewalk, curb and gutter, an ADA ramp, and other items commonly associated with sidewalk projects. 1 LS mobilization; 1 LS traffic control; 1 LS storm water pollution prevention plan (swppp); 1 EA relocate water meter; 120 SY removal and disposal of asphalt surfacing; 600 TN furnish and install clean import granular fill material for embankment, clear and grub as necessary for installation; 24 LF furnish & install 8" PVC stormwater pipe; 25 CF furnish and install riprap; 10 TN furnish and install clean import material for trench backfill; 10 tn furnish & install 1" clean gravel pipe bedding; 5 TN furnish and install crushed pit run to replace pumping soil; 25 SY furnish and install geosynthetic fabric mirafi 600 x or equivalent. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; immediately propose cooperative purchasing as a faster alternative to formal bidding.
Coops: Suggest leveraging Utah statewide coops (Statewide Cooperative Contracts via U3P, NASPO ValuePoint, OMNIA Partners).
City of Garland (UT). No evidence of sole source awards.
Board meetings and strategic plans from City of Garland
The work session reviewed a new dog license form and discussed a garbage rate increase request from Econo Waste. The council also discussed the WAZE app, introduced the interim city engineer, and heard department head reports covering sewer plant issues, pothole repairs, library summer reading plans, and parks and recreation programs. The council meeting included discussions on city property sales, support for a CAPSA funding application, the appointment of a temporary justice court judge, utility rate increases, purchase orders for snow plow equipment and a vacuum truck, and budget review. Several purchase orders were discussed and acted upon.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Garland's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Council Member (Parks and Recreation / Sewer)
Premium
Access the largest public sector contact database
© 2026 Starbridge