Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Cudahy
Milling the existing asphalt surface and placing new asphalt pavement on various street include the removal and replacement of deteriorated curb and gutter, replacement of sidewalk sections, and upgrades to pedestrian curb ramps to meet current ADA standards. Additional improvements include joint-to-joint concrete pavement repairs at various locations impacted by previous water main breaks and utility repairs. Necessary utility repairs and adjustments will be completed prior to roadway construction to allow for completion of the proposed surface improvements.
Posted Date
Jun 29, 2026
Due Date
Jul 9, 2026
Release: Jun 29, 2026
City of Cudahy
Close: Jul 9, 2026
Milling the existing asphalt surface and placing new asphalt pavement on various street include the removal and replacement of deteriorated curb and gutter, replacement of sidewalk sections, and upgrades to pedestrian curb ramps to meet current ADA standards. Additional improvements include joint-to-joint concrete pavement repairs at various locations impacted by previous water main breaks and utility repairs. Necessary utility repairs and adjustments will be completed prior to roadway construction to allow for completion of the proposed surface improvements.
AvailableCity of Cudahy
The Project includes the following Work Modifications to both existing 1.5 million gallon (MG) and 0.5 MG reservoir overflow piping. Installation of approx. 825 LF of 18" buried ductile iron pipe. Abandoning the existing 1.5 MG reservoir overflow and coring a new overflow into the existing reservoir wall. Both overflow pipes will route to a concrete drain outfall.
Posted Date
May 6, 2026
Due Date
May 27, 2026
Release: May 6, 2026
City of Cudahy
Close: May 27, 2026
The Project includes the following Work Modifications to both existing 1.5 million gallon (MG) and 0.5 MG reservoir overflow piping. Installation of approx. 825 LF of 18" buried ductile iron pipe. Abandoning the existing 1.5 MG reservoir overflow and coring a new overflow into the existing reservoir wall. Both overflow pipes will route to a concrete drain outfall.
City of Cudahy
The project consists of fully replacing the street lighting system along E. Layton Avenue from S. Nicholson Avenue to S. Packard Avenue, in the City of Cudahy, WI. Work includes removal of existing lighting units, traffic signal poles, concrete bases, underground circuits, and associated appurtenances, along with relocation and modification of traffic signal equipment and control cabinets. Improvements include installation of city-supplied decorative lighting and signal standards, new concrete bases, pull boxes, and directionally bored conduit with associated 4 AWG and 12 AWG wiring systems. Restoration includes concrete sidewalk, curb and gutter, and ADA-compliant ramp replacement.
Posted Date
Apr 24, 2026
Due Date
May 7, 2026
Release: Apr 24, 2026
City of Cudahy
Close: May 7, 2026
The project consists of fully replacing the street lighting system along E. Layton Avenue from S. Nicholson Avenue to S. Packard Avenue, in the City of Cudahy, WI. Work includes removal of existing lighting units, traffic signal poles, concrete bases, underground circuits, and associated appurtenances, along with relocation and modification of traffic signal equipment and control cabinets. Improvements include installation of city-supplied decorative lighting and signal standards, new concrete bases, pull boxes, and directionally bored conduit with associated 4 AWG and 12 AWG wiring systems. Restoration includes concrete sidewalk, curb and gutter, and ADA-compliant ramp replacement.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Do not pursue; pivot immediately to the WI DOA cooperative route.
Coops: Lead with Wisconsin DOA statewide cooperative contracts; confirm piggyback authority and route the purchase via a WI state contract. If no applicable coop, expect a formal competitive bid via VendorNet; note a 5% local vendor preference.
Entity: City of Cudahy, WI
Status: No viable sole source path; attempts are likely to fail due to rigid procurement practices and high barriers.
Board meetings and strategic plans from City of Cudahy
The meeting included presentations regarding the Packard Public Space project and potential developments on authority-owned property by Sawall Development and Watersview Investments Group. The executive director provided updates on various economic development projects. Additionally, the board entered a closed session to deliberate on the sale of specific public property parcels before reconvening to open session.
The commission reviewed bids for the Water Plant Reservoir Overflow Modifications project and discussed updates on the Raw Water Main rehabilitation. Additional agenda items included reviewing a proposal for AT&T water tower lease changes, planning for fire hydrant painting, and a proposal for a 4th of July hydrant painting contest. The commission also received management updates regarding the Lead Service Line Pilot Project, utility operating reports, staffing, and Capital Improvement Plan (CIP) activities.
The committee meeting agenda includes a discussion and necessary action regarding the 2026 4th of July Celebration, as well as an opportunity for public comment on agenda items.
The meeting agenda includes presentations from EUA regarding the Packard Public Space, as well as development proposals from Sawall Development and Watersview Investments Group concerning properties owned by the Authority. Additionally, the agenda features economic development updates and a closed session to deliberate on the potential sale of specific public property parcels.
The meeting included the election of board officers and updates from the Police and Fire Chiefs regarding hiring processes, staffing, and paramedic status. In a closed session, the commission discussed personnel matters, including probationary status. Following the session, the commission approved permanent status for a detective, extended the probationary period for a fire fighter, and approved the hiring of a new police officer.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Cudahy's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge