Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Cottonwood
Work includes approx. the recoating project for the Tank No. 1 involves maintenance of a 500,000-gallon water storage tank 60' in diameter and 25' in height. The scope of work includes removing sediment from the tank after it has been drained by the city, preparing or removing the existing coating, and applying a new protective coating system. Additionally, the project encompasses lead abatement and disinfection of the tank. See outside link for more details.
Posted Date
Jun 12, 2025
Due Date
Dec 4, 2025
Release: Jun 12, 2025
City of Cottonwood
Close: Dec 4, 2025
Work includes approx. the recoating project for the Tank No. 1 involves maintenance of a 500,000-gallon water storage tank 60' in diameter and 25' in height. The scope of work includes removing sediment from the tank after it has been drained by the city, preparing or removing the existing coating, and applying a new protective coating system. Additionally, the project encompasses lead abatement and disinfection of the tank. See outside link for more details.
City of Cottonwood
Project consist of approx 4,415 LF of 6" dia Pressure irrigation pipe type HPDE DR 17; 38 CY of concrete class 4000BF; 12 LF of 8" dia Pressure irrigation pipe type PVC class 160; 34 LF of 12" dia Pressure irrigation pipe type HPDE DR 17.
Posted Date
Aug 28, 2025
Due Date
Sep 25, 2025
Release: Aug 28, 2025
City of Cottonwood
Close: Sep 25, 2025
Project consist of approx 4,415 LF of 6" dia Pressure irrigation pipe type HPDE DR 17; 38 CY of concrete class 4000BF; 12 LF of 8" dia Pressure irrigation pipe type PVC class 160; 34 LF of 12" dia Pressure irrigation pipe type HPDE DR 17.
City of Cottonwood
The project includes approx 104,291 CY of excavation; 1,460 SY of 12" HDPE gravity sewer pipe; 70 LF of 12" PVC gravity sewer pipe; 730 LF of 8" storm drain pipe; 11,290 SY of gravel access road. 1 LS clearing and grubbing; 1 LS removal of obstructions; 25,100 LF removal of underdrains; 94,062 CY removal of topsoil; 1 LS removal of agroforest irrigation system, above ground; 1 LS removal of agroforest irrigation system, below ground; 1 LS removal of existing pump station pumps; 40 AC removal of agroforest trees; 104,291 CY excavation. See outside link.
Posted Date
Mar 4, 2026
Due Date
Apr 16, 2026
Release: Mar 4, 2026
City of Cottonwood
Close: Apr 16, 2026
The project includes approx 104,291 CY of excavation; 1,460 SY of 12" HDPE gravity sewer pipe; 70 LF of 12" PVC gravity sewer pipe; 730 LF of 8" storm drain pipe; 11,290 SY of gravel access road. 1 LS clearing and grubbing; 1 LS removal of obstructions; 25,100 LF removal of underdrains; 94,062 CY removal of topsoil; 1 LS removal of agroforest irrigation system, above ground; 1 LS removal of agroforest irrigation system, below ground; 1 LS removal of existing pump station pumps; 40 AC removal of agroforest trees; 104,291 CY excavation. See outside link.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Cottonwood's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database