Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Chippewa Falls
Professional engineering services are sought to design a multi-use recreational corridor and destination public space connecting Riverfront Park and Allen Park, including conceptual and implementation-ready designs and final bidding documents for improvements at Allen Park.
Posted Date
-
Due Date
Jul 31, 2026
City of Chippewa Falls
Close: Jul 31, 2026
Professional engineering services are sought to design a multi-use recreational corridor and destination public space connecting Riverfront Park and Allen Park, including conceptual and implementation-ready designs and final bidding documents for improvements at Allen Park.
AvailableCity of Chippewa Falls
Rehabilitation of the sanitary siphons including partial replacement of control structures along with the full replacement of the inverted sanitary siphons. Approx 205 LF of 8" & 12", DIP CL 52 Sanitary sewer; 16 LF of 12" SDR-26 Sanitary sewer; 55 LF of 15" SDR-26 Sanitary sewer; 5 LF of 18" SDR-26 Sanitary sewer; 360 LF of 18" CIPP Lining.
Posted Date
May 5, 2026
Due Date
May 21, 2026
Release: May 5, 2026
City of Chippewa Falls
Close: May 21, 2026
Rehabilitation of the sanitary siphons including partial replacement of control structures along with the full replacement of the inverted sanitary siphons. Approx 205 LF of 8" & 12", DIP CL 52 Sanitary sewer; 16 LF of 12" SDR-26 Sanitary sewer; 55 LF of 15" SDR-26 Sanitary sewer; 5 LF of 18" SDR-26 Sanitary sewer; 360 LF of 18" CIPP Lining.
City of Chippewa Falls
Work consists of street & utility improvement, HMA pavement, base aggregate dense, common excavation, concrete curb and gutter, concrete driveways, concrete sidewalk, sanitary sewer, water main, sanitary services, water services, storm sewer. Work includes 1422 SF of removing concrete sidewalk/driveway; 615 CY of excavation common; 179 TON of HMA pavement 3 lt 58-28 s; 461 LF of concrete curb & gutter 30" type d; 40 LF of concrete curb pedestrian; 16 SF of curb ramp detectable warning field yellow; 44 LF of storm sewer pipe class iii-a 12"; 360 SY of erosion mat urban class 1 type a; 108 LF of sawing asphalt; 158 LF of sanitary sewer main, 8"; 143 LF of televising sanitary sewer; 229 LF of water main, 8"; 8 LF of water main ductile iron, 6"; 50 SF of insulation 2".
Posted Date
Mar 21, 2026
Due Date
Apr 9, 2026
Release: Mar 21, 2026
City of Chippewa Falls
Close: Apr 9, 2026
Work consists of street & utility improvement, HMA pavement, base aggregate dense, common excavation, concrete curb and gutter, concrete driveways, concrete sidewalk, sanitary sewer, water main, sanitary services, water services, storm sewer. Work includes 1422 SF of removing concrete sidewalk/driveway; 615 CY of excavation common; 179 TON of HMA pavement 3 lt 58-28 s; 461 LF of concrete curb & gutter 30" type d; 40 LF of concrete curb pedestrian; 16 SF of curb ramp detectable warning field yellow; 44 LF of storm sewer pipe class iii-a 12"; 360 SY of erosion mat urban class 1 type a; 108 LF of sawing asphalt; 158 LF of sanitary sewer main, 8"; 143 LF of televising sanitary sewer; 229 LF of water main, 8"; 8 LF of water main ductile iron, 6"; 50 SF of insulation 2".
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritize; no clear policy info—route the buyer back to Sourcewell.
Coops: Frequently procures through Sourcewell; you can gain access through the Starbridge reseller & contract-vehicle platform — reach out to your Starbridge contact to pursue onboarding.
City of Chippewa Falls: No accessible public details on sole source policy, thresholds, or approvals.
Board meetings and strategic plans from City of Chippewa Falls
The committee held a meeting to discuss a grievance filed by the Chippewa Falls International Association of Firefighters Local 1816. The discussion took place in a closed session under Wisconsin Statutes, after which the committee returned to open session and voted to issue a written decision regarding the grievance.
The council discussed various business items, including licensing applications for festivals and local businesses, the regulation of convicted child and violent sex offenders, and land use resolutions. Additionally, the council reviewed proposed rezoning requests, property repairs for the Police Department, wastewater equipment maintenance, and discussed the potential sale of city-owned land in a closed session.
The Board discussed alley repaving processes and specific petitions for alley improvements in the Mansfield Addition, recommending Common Council approval for design processes. Discussions also covered a request for an equipment easement across City-owned property, with instructions to refine the lease language and area scope. Additionally, the Board appointed a professional engineer to the Groundwater Technical Review Committee, reviewed a development agreement for the Summit Ridge Phase 1 project, and addressed maintenance responsibilities for the Old Abe State Trail.
The Plan Commission reviewed multiple development projects. This included a request to amend a Planned Development Conditional Use Permit (PDCUP) for the Willow Creek Subdivision, the approval of a Certified Survey Map for Gen 3 Properties/Wurzer Builders, and discussion on a senior living facility project involving rezoning and a Conditional Use Permit. The Commission also reviewed an extraterritorial plat for the Town of Lafayette and discussed various land use proposals, rezoning petitions, and certified survey maps for Chippewa Crossing.
The council held a closed session to conduct interviews for the City Administrator position and to evaluate the candidates' application materials and employment assessments. Upon returning to open session, the council voted on the next steps for the recruitment process and directed the search firm to continue the search for the City Administrator, as no offer was extended to the current finalists.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Chippewa Falls's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
City Planner/Economic Development Director / Transit Manager
Premium
Access the largest public sector contact database
© 2026 Starbridge