Chardon Pocket Park RFP
Posted
Nov 9, 2026
Nov 25, 2026
Provide a park construction project involving landscaping and site work includes 170 sy of concrete removal; 25 LF of concrete curb removal; 400 CY of strip & stockpile existing topsoil; 90 CY of earthwork / excavation; erosion & sediment control measures; 195 LF of 4" shallow pipe underdrain with geotextile fabric; 53 LF of 6" conduit type c; 95 LF of 12" conduit type c; 3,070 SF of concrete sidewalk; 340 LF of 6"x18" concrete curb; 2 EA of curb ramp; 395 SF of aggregate surfacing; 1 EA of electrical power service; 5 EA of pedestrian light pole and luminaire; 5 EA of light pole foundations; 8 EA of pull box / handhold; 200 CY of place stockpiled topsoil.