Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Baxter
Approx 93 each of remove mailbox support; 22967 LF of shoulder preparation; 35193 SY of mill bituminous surface (1.5"); 4234 ton of type sp 9.5 wearing course mixture (3;c); 591 LF of 12" HDPE Pipe Sewer-directional Drilled; etc.
Posted Date
Mar 21, 2026
Due Date
Apr 16, 2026
Release: Mar 21, 2026
City of Baxter
Close: Apr 16, 2026
Approx 93 each of remove mailbox support; 22967 LF of shoulder preparation; 35193 SY of mill bituminous surface (1.5"); 4234 ton of type sp 9.5 wearing course mixture (3;c); 591 LF of 12" HDPE Pipe Sewer-directional Drilled; etc.
AvailableCity of Baxter
34,000 SY - remove bituminous pavement; 430 SY - remove concrete pavement; 24,000 CY - excavation common (ev); 7,000 CY - common embankment (CV); 4,700 CY - aggregate base class 5; 5,500 ton - bituminous mixture (wear and non-wear); 660 SY - 6" concrete driveway/walk; 125 SF - sign type C (includes post); 10,500 LF - 4" to 8" paint; 3,700 LF - 4" schedule 40 PVC sewer service pipe; 8,800 LF - 8" PVC SDR 26 sanitary sewer; 2,400 LF - 6" PVC forcemain; 520 LF - sanitary structure design 4007; 1 ea - lift station; 8,600 LF - 6", 8" or 12" water main - C900 PVC; 33 ea - 6", 8" or 12" gate valve and box; 3,500 LF - 1" type PE pipe; 95 ea - 1" corporation stop and curb stop; 17 ea - hydrant (8.5' bury to 10' bury); 5,000 pound - ductile iron fittings; 300 LF - 15" to 24" RCP storm sewer; 1 ea - storm sewer treatment unit; 2,100 CY - topsoil borrow; 2,700 LF - 8" bioroll wood fiber; 1,300 ea - silt fence, type ms; 50,000 SY - turf restoration (seed or sod).
Posted Date
Feb 6, 2026
Due Date
Mar 10, 2026
Release: Feb 6, 2026
City of Baxter
Close: Mar 10, 2026
34,000 SY - remove bituminous pavement; 430 SY - remove concrete pavement; 24,000 CY - excavation common (ev); 7,000 CY - common embankment (CV); 4,700 CY - aggregate base class 5; 5,500 ton - bituminous mixture (wear and non-wear); 660 SY - 6" concrete driveway/walk; 125 SF - sign type C (includes post); 10,500 LF - 4" to 8" paint; 3,700 LF - 4" schedule 40 PVC sewer service pipe; 8,800 LF - 8" PVC SDR 26 sanitary sewer; 2,400 LF - 6" PVC forcemain; 520 LF - sanitary structure design 4007; 1 ea - lift station; 8,600 LF - 6", 8" or 12" water main - C900 PVC; 33 ea - 6", 8" or 12" gate valve and box; 3,500 LF - 1" type PE pipe; 95 ea - 1" corporation stop and curb stop; 17 ea - hydrant (8.5' bury to 10' bury); 5,000 pound - ductile iron fittings; 300 LF - 15" to 24" RCP storm sewer; 1 ea - storm sewer treatment unit; 2,100 CY - topsoil borrow; 2,700 LF - 8" bioroll wood fiber; 1,300 ea - silt fence, type ms; 50,000 SY - turf restoration (seed or sod).
City of Baxter
Provide 431 LF - remove sewer pipe (storm); 651 LF - remove sewer pipe (sanitary); 50 LF - sawing concrete pavement (full depth); 1,227 LF - sawing bituminous pavement (full depth); 173 LF - remove water main; 2,776 LF - remove curb and gutter; 320 LF - remove sanitary service pipe; 247 LF - remove water service pipe; 7,950 SY - remove pavement; 1,234 CY - common excavation; 493 CY - common embankment(cv); 1,132 CY - aggregate base (cv) class 5 (p). 1 LS mobilization; 2 EA grubbing; 5 EA remove bollard; 10 EA remove casting; 2 EA salvage casting; 2 EA remove light foundation; 7 EA remove sign; 3 EA salvage sign; 5 EA salvage sign type special; 6 EA remove gate valve and box; 6 EA remove curb stop & box; 3 EA remove hydrant; 1 EA remove sanitary cleanout. See attached file.
Posted Date
May 28, 2025
Due Date
Jun 20, 2025
Release: May 28, 2025
City of Baxter
Close: Jun 20, 2025
Provide 431 LF - remove sewer pipe (storm); 651 LF - remove sewer pipe (sanitary); 50 LF - sawing concrete pavement (full depth); 1,227 LF - sawing bituminous pavement (full depth); 173 LF - remove water main; 2,776 LF - remove curb and gutter; 320 LF - remove sanitary service pipe; 247 LF - remove water service pipe; 7,950 SY - remove pavement; 1,234 CY - common excavation; 493 CY - common embankment(cv); 1,132 CY - aggregate base (cv) class 5 (p). 1 LS mobilization; 2 EA grubbing; 5 EA remove bollard; 10 EA remove casting; 2 EA salvage casting; 2 EA remove light foundation; 7 EA remove sign; 3 EA salvage sign; 5 EA salvage sign type special; 6 EA remove gate valve and box; 6 EA remove curb stop & box; 3 EA remove hydrant; 1 EA remove sanitary cleanout. See attached file.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Deprioritized; use a cooperative or compete formally instead.
Coops: If your solution is on Sourcewell, steer them to buy via that contract. If not on a coop: Register as a city contractor and prepare for a formal competitive bid.
Entity: City of Baxter, MN
Stance: Strict adherence to competitive processes; no evidence of sole source awards.
Board meetings and strategic plans from City of Baxter
This document outlines the Future Land Use plan for the City of Baxter, detailing various land use designations. Key areas include Rural Residential, Low Density Residential, Conservation Overlay, High Density Residential, Commercial, Business Gateway, Office Service, Mixed Use, General Industrial, Medium Density Residential, Public/Semi-Public/Institutional, Railroad, Open Water, and Parks/Greenway. The plan also delineates Municipal, Water Supply Management, Sewer Service, and Three-Mile Camp Ripley Buffer boundaries, providing a comprehensive framework for future development and land management.
The commission discussed a conditional use permit to expand a nonconforming deck on Shoreview Drive, another conditional use permit to expand a deck on Highland Scenic Road, and a conditional use permit to expand a nonconforming structure on Shoreview Drive. Additionally, the commission reviewed a conditional use permit for grading and filling in a shoreland overlay district for erosion control on Memorywood Drive. They also discussed city code text amendments, zoning district amendments, and amendments to the zoning map related to the residential zoning district study, including changes to districts and land use regulations. Other topics included a city code amendment to allow administrative approval of lot line modifications and a variance for off-site signage for the Northland Arboretum.
The City of Baxter Mississippi River Overlook Park Master Plan focuses on providing high-quality, non-motorized recreational and educational amenities while preserving and restoring high biodiversity forests, wetlands, and riparian areas. It includes identifying roadway corridors, establishing the Camp Ripley State Veteran's Trail, protecting the Camp Ripley training mission, and identifying outdoor educational opportunities. The plan also addresses community use policies, park maintenance, and potential acquisitions, with a phased approach to development and cost estimates.
The assessment hearing covered the 2021 Mill & Overlay and Full Depth Reclamation Improvements Project. Proposed improvements include full depth reclamation and bituminous paving on College Road and Isle Drive, construction of a concrete median on Glory Road, installation of streetlights at the Meredith Drive and Memorywood Drive intersections, and reconstruction of the bike and pedestrian trail entrance to the City trail system at Paris Road Trailhead. The project includes costs for roadway, storm sewer, water, and trail improvements, with assessments on benefitting commercial properties and special projects funded through MnDOT and the Capital Park Fund.
The City of Baxter's Mississippi River Overlook Park Master Plan focuses on enhancing public use of City-owned open space, preserving natural resources, and providing recreational and educational amenities. Key areas of focus include establishing the Camp Ripley Veterans State Trail, identifying future road corridors, assessing potential outtake partners, and developing a community use policy. The plan aims to balance development with conservation, improve river access, expand educational opportunities, and ensure park accessibility for all users.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Baxter's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database