Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Baudette
Work includes approx 843 LF of 8" sanitary sewer; 270 LF of forcemain (1 1/4" directional bored); 662 LF of 4" sewer services; 142 LF RC storm sewer (various sizes) and related structures; 1,073 TN bituminous surfacing; 3,409 TN aggregate base, 1 grinder station, 2,000 LF concrete curb and gutter and related restoration, 5 lift station bypass structures, 1,140 LF watermain (various sizes), 628 LF water services.
Posted Date
Mar 13, 2026
Due Date
Apr 9, 2026
Release: Mar 13, 2026
City of Baudette
Close: Apr 9, 2026
Work includes approx 843 LF of 8" sanitary sewer; 270 LF of forcemain (1 1/4" directional bored); 662 LF of 4" sewer services; 142 LF RC storm sewer (various sizes) and related structures; 1,073 TN bituminous surfacing; 3,409 TN aggregate base, 1 grinder station, 2,000 LF concrete curb and gutter and related restoration, 5 lift station bypass structures, 1,140 LF watermain (various sizes), 628 LF water services.
AvailableCity of Baudette
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
City of Baudette
Close: Dec 4, 2025
Project consists of main lift station emergency generator installation and lift station generator connection modifications. Contractor to include a stationary 50kw natural gas generator, transfer switch, all raceways, conductors, switches, receptacles, necessary hangars and supports, natural gas extension, service entrance modifications, and generator plug connection modifications at lift station locations as noted. See outside link.
City of Baudette
Reconstruct taxiway A3 and rehabilitate taxiway A1.
Posted Date
Feb 20, 2025
Due Date
Mar 13, 2025
Release: Feb 20, 2025
City of Baudette
Close: Mar 13, 2025
Reconstruct taxiway A3 and rehabilitate taxiway A1.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track City of Baudette's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database