Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Bancroft
Installation of underground electric distribution mainline and secondary circuits.
Posted Date
Jun 12, 2026
Due Date
Jul 29, 2026
Release: Jun 12, 2026
City of Bancroft
Close: Jul 29, 2026
Installation of underground electric distribution mainline and secondary circuits.
AvailableCity of Bancroft
Replacing the existing 15 kv outdoor sheltered aisle metal-clad switchgear. This work includes furnishing and installing a new lineup of 15 kv outdoor sheltered aisle metal-clad switchgear including nine (9) vacuum circuit breakers, with related controls, accessories, and integral building; and one (1) new control panel. This work also includes installing a foundation, conduits, power and control cable, grounding, and splicing into existing distribution feeders. Additionally, the project includes demolition of existing equipment and foundations.
Posted Date
Mar 6, 2026
Due Date
Apr 7, 2026
Release: Mar 6, 2026
City of Bancroft
Close: Apr 7, 2026
Replacing the existing 15 kv outdoor sheltered aisle metal-clad switchgear. This work includes furnishing and installing a new lineup of 15 kv outdoor sheltered aisle metal-clad switchgear including nine (9) vacuum circuit breakers, with related controls, accessories, and integral building; and one (1) new control panel. This work also includes installing a foundation, conduits, power and control cable, grounding, and splicing into existing distribution feeders. Additionally, the project includes demolition of existing equipment and foundations.
City of Bancroft
The equipment to be supplied is described in general as follows: 15 kV Primary Power Cable, 600V Secondary Power Cable, Fault Indicators, Single-Phase Padmount Distribution Transformers, Three-Phase Padmount Distribution Transformers, Padmount Switchgear (Dead-Front, Air-Insulated).
Posted Date
Mar 4, 2026
Due Date
Apr 7, 2026
Release: Mar 4, 2026
City of Bancroft
Close: Apr 7, 2026
The equipment to be supplied is described in general as follows: 15 kV Primary Power Cable, 600V Secondary Power Cable, Fault Indicators, Single-Phase Padmount Distribution Transformers, Three-Phase Padmount Distribution Transformers, Padmount Switchgear (Dead-Front, Air-Insulated).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge