Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Aitkin
Work includes approx. 13 EA of reinstate sanitary sewer service(CIPP lining); 95 LF of rehabilitate sanitary sewer manhole; 2,780 LF of 8" CIPP lining sanitary sewer pipe.
Posted Date
Jun 17, 2026
Due Date
Jul 8, 2026
Release: Jun 17, 2026
City of Aitkin
Close: Jul 8, 2026
Work includes approx. 13 EA of reinstate sanitary sewer service(CIPP lining); 95 LF of rehabilitate sanitary sewer manhole; 2,780 LF of 8" CIPP lining sanitary sewer pipe.
AvailableCity of Aitkin
Work includes Lift Station and pumping structure rehabilitation, Con- struction of a 40-ft. secondary clarifier and splitter structure, Rehabilitation of the existing clarifier, Electrical system improvements and upgrades, and Miscellaneous site work and piping. Bid Package 1 – Earthwork and Site Utilities (Includes Dewatering, Site Concrete, Fence, Foundations, Restoration, and Seeding), Bid Package 2 – General Construction, Bid Package 3 – HVAC, and Bid Package 4 – Electrical.
Posted Date
Jul 16, 2025
Due Date
Jul 30, 2025
Release: Jul 16, 2025
City of Aitkin
Close: Jul 30, 2025
Work includes Lift Station and pumping structure rehabilitation, Con- struction of a 40-ft. secondary clarifier and splitter structure, Rehabilitation of the existing clarifier, Electrical system improvements and upgrades, and Miscellaneous site work and piping. Bid Package 1 – Earthwork and Site Utilities (Includes Dewatering, Site Concrete, Fence, Foundations, Restoration, and Seeding), Bid Package 2 – General Construction, Bid Package 3 – HVAC, and Bid Package 4 – Electrical.
City of Aitkin
Provide Contractor quality control program (cqcp) 1 ls; select granular borrow (p) 3640 cy; reclaim, bituminous 8\" depth 38690 sy; subgrade preparation 10740 sy; type sp 9. 5 wearing course mix (2,b) 5200 ton; reclaimed aggregate base (cv) class 5 1860 cy; type sp 12. 5 non wearing course mix (2,b) 5200 ton; 6\" aggregate base (cv) class 5 2000 cy; temporary pavement markings, with beads 30000 sf; medium intensity taxiway light, led (mitl) 107 ea; permanent pavement markings, with beads 30000 sf; l-858 (l) guidance sign 13 ea; common excavation (p)4550 cy; constant current regulator, 7. 5 kw 1 ea; subgrade excavation 455 cy; vault electrical systems & testing 1 ls; common borrow, off site 4500 cy; l-853 retroreflective taxiway marker 103 ea.
Posted Date
Apr 22, 2025
Due Date
May 15, 2025
Release: Apr 22, 2025
City of Aitkin
Close: May 15, 2025
Provide Contractor quality control program (cqcp) 1 ls; select granular borrow (p) 3640 cy; reclaim, bituminous 8\" depth 38690 sy; subgrade preparation 10740 sy; type sp 9. 5 wearing course mix (2,b) 5200 ton; reclaimed aggregate base (cv) class 5 1860 cy; type sp 12. 5 non wearing course mix (2,b) 5200 ton; 6\" aggregate base (cv) class 5 2000 cy; temporary pavement markings, with beads 30000 sf; medium intensity taxiway light, led (mitl) 107 ea; permanent pavement markings, with beads 30000 sf; l-858 (l) guidance sign 13 ea; common excavation (p)4550 cy; constant current regulator, 7. 5 kw 1 ea; subgrade excavation 455 cy; vault electrical systems & testing 1 ls; common borrow, off site 4500 cy; l-853 retroreflective taxiway marker 103 ea.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $175,000, use sole source. Deprioritize; if asked, pivot back to the cooperative route.
Coops: Lead with Sourcewell; confirm your product is on contract and route the purchase via the coop to avoid a formal bid.
City of Aitkin (MN) shows no evidence of approving sole source awards (2021–2024) and maintains a rigid stance. Practical takeaways: treat sole source as unlikely; expect strict justification and approvals if attempted.
Board meetings and strategic plans from City of Aitkin
The City Council passed Ordinance No. 419, which amends Chapter 133 of the City Code, specifically §33.01, concerning the Fee Schedule. The ordinance's full text is available for public inspection at the City Administration Office during normal business hours.
This comprehensive plan serves as a guiding document for future policy makers in the City of Aitkin. It focuses on investing in infrastructure to keep pace with growth, growing local businesses, anticipating the needs of a growing senior population, and protecting and enhancing the natural resources that make the community unique.
The Aitkin City Council held a regular meeting where they discussed various topics. They approved the agenda and consent agenda, which included minutes from a previous meeting, accounts payable, a fire contract draft, gambling permit application, and a special event permit. The Mayor reported on community engagement events and efforts to secure funding for the Wastewater Treatment Plant. The council discussed progress on nuisance properties and the need for a performance review for the City Administrator. They approved a revised plan for the Rain Garden at the Library and received an update on Fieldhouse punch list items. The County Assessor presented the 2025 assessment summary. The council approved a Memorandum of Understanding for a Records Tech Phone Stipend, Ordinance No. 414, and a quote for the Fire Department and Police Department Re-Roof Project. They also approved the purchase of miViewPoint and AP Workflow software modules and an agreement for consulting services. A new hire for the Liquor Store was approved.
The council meeting addressed several key items. A change order was approved for the Fieldhouse project, reflecting a deduction in liquidated damages. An invoice from Baratto Brothers was approved, covering additional expenses related to the Fieldhouse project. A liability coverage waiver form was approved, ensuring compliance with municipal tort liability statutes. The council reviewed and approved the 2023-2024 Pay Equity Report and a resolution authorizing the issuance and sale of a GO Bond for the Water Storage Improvement Project. Finally, updates were provided on the ice rinks closure and the upcoming ash tree removal project.
The council meeting covered various topics, including the approval of the consent agenda (minutes, accounts payable, financial reports, and agreements), a mayor's report highlighting the Fieldhouse grand opening and police department achievements, and an administration report on upcoming legislative advocacy. Key discussions included the 2025-2026 insurance renewal, including adjustments for a new building and vehicles; acceptance of a donation from Northern Lakes Hockey Association for the Park Fund; and the purchase of benches for the Community Fieldhouse. The meeting also involved budget committee discussions, park committee and tree board updates, and a closed session to discuss potential litigation.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Aitkin's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge