Nauvoo Visitors Center HVAC RFP
Posted
Jun 18, 2026
Dec 3, 2026
Work generally consists of replacement of existing indoor air handlers and hot/cold mixing boxes along with boilers, pumps and roof mounted condensing units. Existing ductwork will be modified, and new piping will be installed to connect to new VAV boxes and a new control system.
