Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Chippewa Cree Construction Corporation
Construct the pump station, tank, and site improvements at the new ROCKY BOY'S ON-RESERVATION PHASE 1 site. The Contract No. 1: Phase 1 Pump Station and Tank consists of the following improvements: New construction of a 5.4 MGD pump station., New architectural precast building, below grade cast in place concrete, structural steel, roofing, windows and doors, Associated process equipment, pumps, piping, valves, chemical feed, and appurtenances, Mechanical system including HVAC units, duct work, fans, Electrical work generally consists of new switch gear, motor control centers, emergency backup power generator, conduits, cables, and other connections, The installation of site pipe ranging from 3/4 to 24 pipe with appurtenances, valves, etc. Installation of cathodic protection systems, Final site grading, street signage, and access road completion, Landscaping, fencing, drainage systems, and seeding, Exterior site lighting. New construction of 1 MG AWWA D110 Type III prestressed concrete tank or AWWA D103 glass-fused boltedsteel tank (Alternate No. 1).
Posted Date
Jun 18, 2026
Due Date
Jul 22, 2026
Release: Jun 18, 2026
Chippewa Cree Construction Corporation
Close: Jul 22, 2026
Construct the pump station, tank, and site improvements at the new ROCKY BOY'S ON-RESERVATION PHASE 1 site. The Contract No. 1: Phase 1 Pump Station and Tank consists of the following improvements: New construction of a 5.4 MGD pump station., New architectural precast building, below grade cast in place concrete, structural steel, roofing, windows and doors, Associated process equipment, pumps, piping, valves, chemical feed, and appurtenances, Mechanical system including HVAC units, duct work, fans, Electrical work generally consists of new switch gear, motor control centers, emergency backup power generator, conduits, cables, and other connections, The installation of site pipe ranging from 3/4 to 24 pipe with appurtenances, valves, etc. Installation of cathodic protection systems, Final site grading, street signage, and access road completion, Landscaping, fencing, drainage systems, and seeding, Exterior site lighting. New construction of 1 MG AWWA D110 Type III prestressed concrete tank or AWWA D103 glass-fused boltedsteel tank (Alternate No. 1).
AvailableChippewa Cree Construction Corporation
Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, with additive alternate bid items as indicated in the Bid Form. The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to construct the interior fire suppression sprinkler system at the new Rocky Boy’s WTP Phase 1 site in accordance with the plans and specifications. This bid package is part 6 of a multiple bid package project that generally comprises the following: General Construction The General Construction Contract #6 consists of the following improvements:•Installation of fire suppression sprinklers and appurtenances inside the main water treatment plant building •Alternate No. 1 – Fire Suppression System PaintingThe Contractor shall have the following minimum qualifications: Contractor must have completed the installation of 10 Fire Suppression Sprinkler systems of similar capacity. The Owner reserves the right to request detailed information about such projects for the specified holding period after bid opening. All Bids must be in accordance with the Bidding Documents on file with the Chippewa Cree Construction Corporation (Owner) at 93 Mack Road, Box Elder, MT, 59521 or the office of Advanced Engineering and Environmental Services (AE2S) (Engineer) at 405 3rd Street NW Suite 205 Great Falls, MT 59404. Technical bid questions shall be directed to Mr. David. Carlson, PE at 406-702-7716 or email at david.carlson@ae2s.com. Neither Buyer nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. All Bids shall be prepared according to the Instruction to Bidders contained within the Project Manual. Each Bid shall be accompanied by A SEPARATE ENVELOPE containing Bidder’s Security (and other documentation as outlined in Article 3 – Qualifications of Bidders, as printed in the Instructions to Bidders), payable to the Chippewa Cree Construction Corporation, in a sum equal to ten percent (10%) of the full amount of the Bid, executed by the Bidder as principal and by a surety company authorized to do business in the State of Montana, conditioned that if the principal’s Bid be accepted and the contract awarded, principal, within fifteen (15) days after Notice of Award, will execute and effect a Contract in accordance with the terms of the principal’s Bid and a Contractor’s Bond as required by the laws of the State of Montana. Only Bids that are accompanied by such a Bond (and other Qualifications) will be considered. Successful Bidders will be required to furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one-hundred percent (100%) of the contract amount as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Insurance, as required, shall be provided by the successful Bidders and certificate(s) of that insurance shall be provided. All Bidders shall strictly follow the directions outlined in the Instructions to Bidders when submitting their bid. The project will be funded with federal funds from the Bureau of Reclamation (BOR). The ensuing contract between Owner and Contractor requires conformance with all requirements of participating funding agencies, generally outlined in Section 00 73 40 – Funding Agency Special Provisions. Bidder shall be responsible for understanding its responsibilities under each of these participating funding agencies. Those requirements include, but are not limited to, the following:•The Montana Department of Labor and Industry Requirements •DBE Subcontractor Solicitation Requirements •Wage Determination Requirements (Davis Bacon and Montana prevailing wage) •Gross Receipts Withholding Requirements •TERO Requirements •Equal Employment Opportunity Requirements Under Executive Order 11246 •Contractor Eligibility and Certification Regarding DebarmentAll Bids will be made on the basis of cash payment for such work. The Chippewa Cree Construction Corporation reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contract in the best interests of the Chippewa Cree Construction Corporation. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening. The work for each contract must be completed in accordance with the dates outlined in the Agreement. The Work shall be substantially completed by September 1, 2026, and shall be completed and ready for final payment on or before October 31, 2026.
Posted Date
May 22, 2025
Due Date
Jul 1, 2025
Release: May 22, 2025
Chippewa Cree Construction Corporation
Close: Jul 1, 2025
Bids will be received for a single prime Contract. Bids shall be on a lump sum basis, with additive alternate bid items as indicated in the Bid Form. The Work Generally consists of furnishing all labor, skill, equipment, and construction materials to construct the interior fire suppression sprinkler system at the new Rocky Boy’s WTP Phase 1 site in accordance with the plans and specifications. This bid package is part 6 of a multiple bid package project that generally comprises the following: General Construction The General Construction Contract #6 consists of the following improvements:•Installation of fire suppression sprinklers and appurtenances inside the main water treatment plant building •Alternate No. 1 – Fire Suppression System PaintingThe Contractor shall have the following minimum qualifications: Contractor must have completed the installation of 10 Fire Suppression Sprinkler systems of similar capacity. The Owner reserves the right to request detailed information about such projects for the specified holding period after bid opening. All Bids must be in accordance with the Bidding Documents on file with the Chippewa Cree Construction Corporation (Owner) at 93 Mack Road, Box Elder, MT, 59521 or the office of Advanced Engineering and Environmental Services (AE2S) (Engineer) at 405 3rd Street NW Suite 205 Great Falls, MT 59404. Technical bid questions shall be directed to Mr. David. Carlson, PE at 406-702-7716 or email at david.carlson@ae2s.com. Neither Buyer nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. All Bids shall be prepared according to the Instruction to Bidders contained within the Project Manual. Each Bid shall be accompanied by A SEPARATE ENVELOPE containing Bidder’s Security (and other documentation as outlined in Article 3 – Qualifications of Bidders, as printed in the Instructions to Bidders), payable to the Chippewa Cree Construction Corporation, in a sum equal to ten percent (10%) of the full amount of the Bid, executed by the Bidder as principal and by a surety company authorized to do business in the State of Montana, conditioned that if the principal’s Bid be accepted and the contract awarded, principal, within fifteen (15) days after Notice of Award, will execute and effect a Contract in accordance with the terms of the principal’s Bid and a Contractor’s Bond as required by the laws of the State of Montana. Only Bids that are accompanied by such a Bond (and other Qualifications) will be considered. Successful Bidders will be required to furnish an approved Performance Bond and a Labor and Materials Payment Bond, each in the amount of one-hundred percent (100%) of the contract amount as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. Insurance, as required, shall be provided by the successful Bidders and certificate(s) of that insurance shall be provided. All Bidders shall strictly follow the directions outlined in the Instructions to Bidders when submitting their bid. The project will be funded with federal funds from the Bureau of Reclamation (BOR). The ensuing contract between Owner and Contractor requires conformance with all requirements of participating funding agencies, generally outlined in Section 00 73 40 – Funding Agency Special Provisions. Bidder shall be responsible for understanding its responsibilities under each of these participating funding agencies. Those requirements include, but are not limited to, the following:•The Montana Department of Labor and Industry Requirements •DBE Subcontractor Solicitation Requirements •Wage Determination Requirements (Davis Bacon and Montana prevailing wage) •Gross Receipts Withholding Requirements •TERO Requirements •Equal Employment Opportunity Requirements Under Executive Order 11246 •Contractor Eligibility and Certification Regarding DebarmentAll Bids will be made on the basis of cash payment for such work. The Chippewa Cree Construction Corporation reserves the right to reject any and all Bids, to waive irregularities and informalities, and to award the Contract in the best interests of the Chippewa Cree Construction Corporation. The Owner reserves the right to hold the three (3) low Bids for a period of sixty (60) days after the date of the Bid opening. The work for each contract must be completed in accordance with the dates outlined in the Agreement. The Work shall be substantially completed by September 1, 2026, and shall be completed and ready for final payment on or before October 31, 2026.
Chippewa Cree Construction Corporation
Design and Construction of a New Pre-Packaged Fire Pump System In accordance with NFPA 20 requirements; The installation of buried piping to connect existing supply and discharge pipes to new fire pump house; Construction of new fire pump house concrete foundation, slab, and associated finishes and fixtures; Procurement, installation, and commissioning of a prepackage fire pump system with complete building enclosure, associated appurtenances, controls, heating, ventilation, and electrical systems; Electrical work generally consists of buried conduits and conductors, Junction boxes, level and temperature sensor installation and connections to existing medium voltage systems; Connections and integration into existing fire alarm system
Posted Date
Apr 17, 2025
Due Date
May 29, 2025
Release: Apr 17, 2025
Chippewa Cree Construction Corporation
Close: May 29, 2025
Design and Construction of a New Pre-Packaged Fire Pump System In accordance with NFPA 20 requirements; The installation of buried piping to connect existing supply and discharge pipes to new fire pump house; Construction of new fire pump house concrete foundation, slab, and associated finishes and fixtures; Procurement, installation, and commissioning of a prepackage fire pump system with complete building enclosure, associated appurtenances, controls, heating, ventilation, and electrical systems; Electrical work generally consists of buried conduits and conductors, Junction boxes, level and temperature sensor installation and connections to existing medium voltage systems; Connections and integration into existing fire alarm system
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge